Upgrading the Bridge at Sungai Menora for 52m UHPFRC

Project: To Construct and Upgrade Bridge at Sungai Menora, at Road A164 (Sayong – Tanjung Belanja)

(Pembinaan Dan Menaiktaraf Jambatan Di Sungai Menora, Di Laluan A164 (Sayong – Tanjung Belanja))

GPS Location: 4.708831 N, 100.943682 E

Structure Type: Single Spans 52m by 6.65m Wide UHPFRC integral beam-deck system.

Superstructure Feature: 2 pieces of DURA® UBG2000-52m

Substructure Feature: Cast in-situ RC abutments

Foundation Feature: 450mm dia. Spun pile (Class B)

Loading Type: HA+ 45 units HB loadings (BD37/01)

Client: Kerajaan Negeri Perak

S.O.: JKR Kuala Kangsar  JKR

Consultant: JKR Perak  JKR

Contractor: Kembang Abadi Sdn Bhd

Contract Period: 16 Months

Construction Status: Completed
       

Existing bridge at Sg. Menora
Fixing pile cap reinforcement (060820).
Project Detail
Abutments ready to receive beams.
Abutment B under construction.
Two numbers of UBG2000-52m assembled behind the abutment.
Preparation for post-tensionign work by PSC Freysinet team.
PT work in progress.
Liftig of first beam (241020).
Positioning of first beam.
Positioning of second beam.
Beam launching completed.
Steel bar for RC deck.
Preparation of formwork and rebar for bridge deck.
Installation of precast parapet.
Completion in installation or RC parapet and RC decking.
Granular material compacted at approach slab.
Completed bridge.
Completed bridge.
Completed bridge.
Completed bridge.
Completed bridge.
Completed bridge.
Existing bridge at Sg. Menora
01/23 
start stop bwd fwd


Dura IB650 for the New Bridge in Sg. Mulong

Project: To Build A New Bridge At Jalan Pasir Tumboh / Wakaf Che Yeh, Kota Bharu, Bharu, (Sg. Mulong)

 (Cadangan Pembinaan Jambatan Baru Di Jalan Pasir Tumboh / Wakaf Che Yeh, Kota Bharu, Kelantan) (Sg. Mulong)

GPS Location: 6.056278 N; 102.278867 E

Structure Type: Three Spans UHPFRC Beam Composite In Situ Deck Bridge System: 44.78m x 7.9m wide.

Superstructure Feature: 15 pieces of DURA® IB650-12m with Cast In-Situ RC Deck

Substructure Feature: 2 nos. of Cast in-situ RC abutments & 2 nos. of Cast in-situ RC Piers

Foundation Feature: 450mm Spun Pile (Class C)

Loading Type: HA+KEL or 45 units HB loadings

Client: JKR Kelantan  JKR

S.O.: JKR Kelantan   JKR

Consultant: Global Niche Consultant

Contractor: K.A.Z Trading (M) Sdn Bhd

Contract Period:

Construction Status: Completed       

Substructures constructed and ready to receive beams.
Abutmen A.
Pier 2.
Substructure done and ready for beam launching.
Substructure done and ready for beam launching.
Bridge ready for beam launching.
Beam launching in progress (040220).
All beams launched.
All beams launched in a day.
Installation of precast parapet (250620).
In-situ RCC deck done.
Completion of bridge part, leeft apporach road and wearing surface.
Soon Sg Mulong bridge is ready for traffic use.
Compaction of crusher run material at the approach road.
Completed bridge.
Completed bridge.
Completed bridge.
Completed bridge.
Substructures constructed and ready to receive beams.
01/18 
start stop bwd fwd