2013 Projects

The Perak Royal District (K. Kangsar) First Dura Bridge

kg kati panaroma

Project: To Construct a New Bridge at Kampung Chuar (Old Pekan Kati Road), Kuala Kangsar District, Peral D.R.


(Cadangan Membaiki Jambatan Di Kampung Chuar (Jalan Lama Pekan Kati), Daerah Kuala Kangsar, Perak Darul Ridzuan).

Structure Type:  Single span 30m long x 11.7m wide DURA integral beam-deck system.

Superstructure Feature: 8 pieces of DURA TBG1325-29.5m

Substructure Feature: Cast in-situ RC abutments

Foundation Feature: 600mm diameter spun pile (Grade80, Class B)

Loading Type: Full HA+45HB Highway loading

Client: JKR Malaysia       JKR                    Consultant: Jurutera Perunding Concrete Technology

Contractor: Pancar Sempadan Sdn Bhd

Contract Period: 7 months

Status: Completed

Project sign board.
Existing bailey bridges at Kg Chuar crossing Sg. Temong.
Existing bailey bridges at Kg Chuar crossing Sg. Temong.
Demolision of existing bailey bridges (18/06/2013).
Demolision of existing bailey bridges by JKR Kinta teams (18/06/2013).
Piling work in progress (21/08/2013).
Dura beam unloaded to site (01/09/2013).
Both abutments ready for concreting (12/10/2013).
Abutment completed (26/10/2013).
Uploading beam to truck (31/10/2013).
Lifting of 1st beam (31/10/2013).
Lifting of 2nd beam (31/10/2013).
Lifting of 3rd beam (31/10/2013).
Eight beams lauched (01/11/2013).
Top deck view.
Side view (02/11/2013).
Soffit view (02/11/2013).
Completion of UHPC stitching work (15/11/2013).
RC parapet casted (06/12/2013).
Completed new bridge open for public (24/12/2013).
New bridge sealed with wearing coarse.
New bridge sealed with wearing coarse.
New bridge sealed with wearing coarse.
Kg Chuar bridge (06/02/2014).
Project sign board.