2013 Projects

First Dura Bridge at the State of Pahang


Project: To Repair and Build New Bridge at Kampung Desa Murni, Kuala Rompin, Rompin, Pahang.

(Membaikpulih dan Membina Jambatan Baru di Kampung Desa Murni, Kuala Rompin, Daerah Rompon, Pahang.)

Structure Type: Single span 12m x 4m wide UHPdC integral beam-deck system.

Superstructure Feature: 4 pieces of DURA® Universal Beam UB650-12m c/w 100mm thk DURA® deck

Substructure Feature: 200mm Square RC piles

Loading Type:
Full HA+45 unit HB loadings

Client: JKR Pahang   JKR  

Consultant: Dura Technology Sdn Bhd

Contractor: AZ Maju Enterprise

Contract Period: 14 weeks

Construction Status: Completed

A damaged access bridge a Kg. Desa Murni of Kuala Rompin.
Formwork preparation for UHPC decking (10/10/2013).
UHPC deck casted (11/10/2013).
Abutment and foundation at site.
Arrival of Dura precast bridge to site (25/10/2013).
Lifting of first half of the bridge using two units 20 tonnes capacity crane (25/10/2013).
Beams lifting completed.
Placing of 15mm thin DURA left-in placed formwork.
Newly launched Desa Murni bridge.
Completed Desa Murni bridge.
Completed Desa Murni bridge.
Completed Desa Murni bridge.
Completed Desa Murni bridge.
Completed Desa Murni bridge.
Completed Desa Murni bridge.
Completed Desa Murni bridge.
A damaged access bridge a Kg. Desa Murni of Kuala Rompin.