2014 Projects

52m Single Span Crossing Sungai Ara for JPS Flood Mitigation Project


Sg Ara panaroma


Project:
Kerja-Kerja Membina Dan Pencegah Banjir Sungai Ara Serta Kerja Kerja Lain Yang Berkaitan, Dearah Larut Matang Dan Selama, Perak Darul Ridzuan (Bridge 3 Sg. Ara CH 1250).

Structure Type: Single span 52m x 4.8m wide UHPdC U beam composite bridge

Superstructure Feature: 1 pieces of DURA® UBG1750-52m topped with 180mm thk in-situ RC deck slab

Substructure Feature: 450mm dia. Spun Pile (Class B)

Loading Type: Full HA+30 unit HB loadings

Client: JPS Perak   jps

Consultant: Dura Technology Sdn Bhd

Contractor: JJM Sdn Bhd                            

Construction Status: Completed

The proposed new bridge site, Sungai Ara.
The existing old bridge.
Spun pile used in foundation (19/10/2013).
Unloading beam segments (07/11/2013).
Alignment DURA U segments (09/12/2013).
Post-tensioning in progress (02/01/2014).
52m DURA girder fully post-tensioned (02/01/2014).
Preparation of timber formwork for in-situ concrete decking (16/01/2014).
Preparation of timber formwork for in-situ concrete decking (16/01/2014).
Completion of bridge work (01/03/2014).
Sg Ara bridge.
Elevation view of Sg Ara bridge.
Newly constructed Sg Ara bridge.
Newly constructed Sg Ara bridge.
Newly constructed Sg Ara bridge.
The proposed new bridge site, Sungai Ara.