Second Dura Composite Bridge Crossing Sungai Kurau


Project:
Kerja-Kerja Membina Dan Pencegah Banjir Sungai Kurau Dari Hulu kolam Bukit Merah Ke Pondok Tanjung Sepanjang 8.4 km Serta Kerja Kerja Lain Yang Berkaitan, Dearah Kerian, Perak Darul Ridzuan (Bridge 1 Sg. Kurau CH.3336.5)

Structure Type: Single span 50m x 4.8m wide UHPdC U beam composite bridge

Superstructure Feature: 1 pieces of DURA® UBG1750-50m topped with 180mm thk in-situ RC deck slab

Substructure Feature: 450mm dia. Spun Pile (Class B)

Loading Type: Full HA+30 unit HB loadings

Client: JPS Perak   jps

Consultant: Dura Technology Sdn Bhd

Contractor: Aspasia Construction & Development S/B                                  

Construction Status: Completed

Signboard showing project detail.
Sungai Kurau.
Existing crossings.
Completion of piling work, maintain load test in progress (15/10/2013).
Newly assembled precast DURA U girder using intermediate support method (16/02/2014).
PT work officers get ready to install cable to the beam (16/02/2014).
Preparing timber formwork for RC decking (03/03/2014).
Preparing timber formwork for RC decking (03/03/2014).
Preparing timber formwork for RC decking (03/03/2014).
Newly completed single span DURA composite bridge crossing Sunga Kurau.
Newly completed single span DURA composite bridge crossing Sunga Kurau.
Newly completed single span DURA composite bridge crossing Sunga Kurau.
Signboard showing project detail.