DURA Bridge Used Near National Park, Pahang


Project: Menaiktaraf Jalan Luar Bandar Dalam Dun Tahan - Jalan Sungai Yap Ke Kampung Kluang, Kuala Tembeling, Daerah Jerantut, Pahang Darul Makmur.


GPS Location: 4.065233N; 102.329709 E

Structure Type: Single span 51m long x 8m wide UHPC composite bridge

Superstructure Feature: 2 pieces of DURA® UBG2000-49.5m

Substructure Feature: 450mm dia. spun pile (Class B)

Client: JKR Pahang    JKR

S.O.: JKR Daerah Jerantut

Consultant: Concrete Technology Sdn Bhd

Contractor: Gabungan Perintis S/B (Class C)

Contract Period: 48 weeks

Construction Status: Completed

Existing road lead to Sg Yap bridge.
Existing 2.2m wide narrow bridge.
Existing 2.2m wide narrow bridge.
Completion of piling work at Abutment A (06/07/2014).
Casting of abutments (13/08/2014)
Unloading first end segment of UBG2000 (13/08/2014).
Three segments assembled and aligned (13/08/2014).
Post-tensioning of first beam (20/08/2014).
Post-tensioning of first beam (20/08/2014).
Both abutments are completed and ready for beam launching.
Both abutments are completed and ready for beam launching.
Project sign board and detail.
Preparation for beam launching (06/09/2014).
First U-beam uploaded (06/09/2014).
First U-beam uploaded (06/09/2014).
Transporting 1st beam to abutments.
Transporting 1st beam to abutments.
2 units of 160 tonnes all terrain cranes are used to lift the first beam (06/09/2014).
Positioning of DURA UBG2000-49.5m to the plinth seating.
1st U beam positioned onto the abutments.
Uploading 2nd U-beams (07/09/2014).
2 units of 160 tonnes all terrain cranes are used to lift the second beam (07/09/2014).
2 units of 160 tonnes all terrain cranes are used to lift the second beam (07/09/2014).
Beam launching completed.
Abutment concreted (20/09/2014).
The completed single span 50m long DURA composite bridge crossing Sg Yap (Jerantut, Pahang).
The newly built bridge fully submerged in river water during the extreme flood event in Malaysia history.
Sungai Yap bridge not effected by the flood. Picture take after one year. (10/10/20015).
Sungai Yap bridge not effected by the flood. Picture take after one year. (10/10/20015).
Sungai Yap bridge not effected by the flood. Picture take after one year. (10/10/20015).
Sungai Yap bridge not effected by the flood. Picture take after one year. (10/10/20015).
Sungai Yap bridge not effected by the flood. Picture take after one year. (10/10/20015).
Existing road lead to Sg Yap bridge.