2015 Projects

DURA Viaduct to Free the Elephants From Accidents

 42

Project: To Construct a Viaduct and Other Related Works at Section 49, Freeway 4 (KM157 Gerik-Kota Bahru), Corridor Ecology of Central Forest Spine (CFS), Gerik, Perak D.R. 
(Membina dan Menyiapkan 'Viaduct' dan Lain-Lain Kerja Yang Berkaitan Di Seksyen 49, Laluan 4 (KM 157 Gerik-Kota Bahru), Koridor Ekologi Central Forest Spine (CFS), Gerik, Perak Darul Ridzuan.)

Structure Type: Five span 40m x 17.4m wide UHPC composite bridge, total length of 200m.

GPS Coordinate: 5.586919N, 101.477091 E

Superstructure Feature: 15 pieces of DURA® UBG2000-39.5m

Substructure Feature: 300mm diameter micropiles

Client: Jabatan Perhutanan Semenanjung Malaysia   Jabatan Perhutanan Semenanjung Malaysia       S.O.: JPS and JPS Perak    jps

Consultant: Perunding HJRS Sdn Bhd    hjrs        Contractor: Empayar Kukuh Sdn Bhd

Contract Period: 18 months

Construction Status: Completed 

Project sign board.
Micropile machine ready to start work (22/12/2013).
Micropiling work in progress (03/03/2014).
Micropile done at abutment A.
Drilled of holes at pier 1.
The site.
Unloading DURA U beam (29/04/2014).
Two numbers of DURA UBG2000-39.5m assembled at site (29/04/2014).
Construction of piers in progress (19/09/2014).
Pier 3 partially completed (19/09/2014).
Construction of pier 2 in progress (19/09/2014).
PC strands were installed in DURA beams.
Substructures all ready for beam launching (02/11/2014).
Beam launching (07/11/2014).
Beam launching (07/11/2014).
Three spans launched (07/11/2014).
Three spans launched (07/11/2014).
All Dura beams launched (12/11/2014).
All Dura beams launched (12/11/2014).
Steel reinforcement for in situ decking on slab 4.
Epoxying the segmental joint and painting it.
In preparation to cast the final two spans.
Bottom view of Central Forest Spine (CFS) bridge.
Bottom view of Central Forest Spine (CFS) bridge.
Scaffolding and timber formwork used as formwork for RC decking (CFS) bridge.
Launching precast parapet.
Launching precast parapet.
Launching precast parapet.
Completion of five span DURA composite bridge, 200m long x 17.6m wide.
Beam soffit view.
Side view of the new bridge.
Approach road of CFS bridge.
Pavement view of CFS bridge.
CFS bridge open to traffic.
Completed CFS bridge.
Completed CFS bridge.
Completed CFS bridge.
Completed CFS bridge.
Completed CFS bridge.
Open ceremony day for CFS bridge (22/09/2015).
Soffit view of the CFS bridge (22/09/2015)
After 2 years.
After 2 years.
Project sign board.