DURA Bridge Technology Used at Remotest Part of Sabah


Project
: Cadangan Kerja-kerja Membina dan Menyiapkan Jalan Masuk Dari Kg. Kapitangan ke Kg. Dogoton, Pulau Banggi, Daerah Kudat, Sabah.

GPS Location: 7.324N; 117.132E (Bridge 3); 7.327N; 117.133E (Bridge 4)

Structure Type: Single span 24m long x 5.1m wide (Bridge 3) and single span 30m long x 5.1m wide (Bridge 4) using DURA integral beam-deck system

Superstructure Feature: 3 pieces of DURA TBG1325-24m and3 pieces of DURA TBG1325-30m

Substructure Feature: Cast in-situ RC abutments

Foundation Feature: 300mm square RC pile

Loading Type: Full HA+30HB Highway loading

Client: KKLW    Logo KKLW            

Consultant: Jurutera Perunding Concrete Technology

Contractor: Felcra-Bina Sdn Bhd

Contract Period: 12 months

Construction Status: Completed
Pulau Banggi, Kudat District of Sabah state.
Entrane of Sk. Kapitangan.
The school was powered by solar power technology which was the project scheme undetook by KKLW.
The site visit was lead by the Secretary of KKLW (Technical Division ), Ir. Tuan Haji Razani bin Ab Lazid.
A 75m long steel composite bridge recently built.
Project Signboard at Bridge 3.
Piling in progress (06/08/2014).
Piling in progress (06/08/2014).
Prepartion of steel reinforcement (06/08/2014).
All DURA TBG segments are ready to be transported to Sabah (12/09/2014).
Loading bridge segment into a 40 footer container (11/10/2014).
A 6m length end segment of the T beam loaded into a container (11/10/2014).
Arrival of 40ft container to Kota Kinabalu port.
Uploading T-beam segments onto a 150ft long scout, which is ready to be tugged to Pulau Banggi.
At Puala Banggi, unloading segments using all-terrain crane.
At Puala Banggi, unloading segments using all-terrain crane.
All beam segments transported to bridge sites.
Assembly of bridge segments (Bridge 4).
Assembly of bridge segments (Bridge 4).
Bridge 4 fully assembled.
Bridge 3 fully assembled.
Prestressing strands and anchorage accessories all installed (Bridge 4).
Post-tensioning work in progress.
Bridge 4 beams post-tensioned.
Bridge 4 beams post-tensioned.
Bridge 3 beams post-tensioned.
RC parapet casted.
Pulau Banggi, Kudat District of Sabah state.