DURA Light-Weight Bridge System Used in Bota


Project
: Kerja Membaikpulih Semula Struktur Jambatan I-Beam Yang Runtuh Menyeberangi Sungai Sengkuang Dan Gabion Yang Rosak Ke Jalan Masuk Perkampungan Orang Asli Tumboh Hangat, Mukim Bota, Daerah Perak Tengah, Perak Darul Ridzuan.  (Medium Traffic Bridge).

GPS Location: 4.313501N, 100.92444E

Structure Type: Single Span 15m long x 4m wide DURA composite bridge

Superstructure Feature: 3 pieces of DURA® IB650-15m

Substructure Feature: 2 nos. of cast in-situ RC abutments

Foundation Feature: 200mm square RC piles (JKR Class 1)

Loading Type: HA + KEL loading + 30 Units HB Loadings (BD37/01)

Client: JPS Perak     jps

Consultant: Jurutera Perunding Concrete Technology

Contractor: SL Construction

Contract Period: 3 months

Construction Status: Completed       
Transporter reversing the truck into the job site through a narrow road.
Lifting DURA I beam using one unit 45 tons mobile crane.
Three numbers of Dura I-beam seated on abutments.
Preparation of timber formwork (edge deck) and left in formwork.
Preparation of steel reinforcement.
Completed Sg Sengkuang Bridge within 3 months.
Completed Sg Sengkuang Bridge within 3 months.
Completed Sg Sengkuang Bridge within 3 months.
Completed Sg Sengkuang Bridge within 3 months.
Completed after 6 months (28/03/2016).
Completed after 6 months (28/03/2016).
Completed after 6 months (28/03/2016).
Completed after 6 months (28/03/2016).
Transporter reversing the truck into the job site through a narrow road.