Login Form



2015 Projects

DURA Light-Weight Bridge System Used in Parit Sadang


Project
: Kerja Membina Semula Jambatan Parit Senin Rancangan Saliran Pertanian Sadang, Mukim Belanja, Daerah Perak Tengah, Perak Darul Ridzuan.  (Medium Traffic Bridge).

GPS Location: 4.488897N, 100.898787 E

Structure Type: Single Span 18m long x 6m wide DURA composite bridge

Superstructure Feature: 4 pieces of DURA® IB650-18m

Substructure Feature: 2 nos. of cast in-situ RC abutments

Foundation Feature: 200mm square RC piles (JKR Class 1)

Loading Type: HA + KEL loading + 30 Units HB Loadings (BD37/01)

Client: JPS Perak     jps

Consultant: N/A

Contractor: Anjung Kenari

Contract Period: 3 months

Construction Status: Completed
Abutments constructed and ready for beam launching.
A unit of 45t mobile used for beam launching.
Four light-weight DURA IB650-18m launched within an hour.
Four light-weight DURA IB650-18m launched within an hour.
Preparation of timber formwork for in-situ decking.
Preparation of timber formwork for in-situ decking.
Preparation of timber formwork for in-situ decking.
After 6 months (28/03/2016).
After 6 months (28/03/2016).
After 6 months (28/03/2016).
Abutments constructed and ready for beam launching.
01/10 
start stop bwd fwd



contentmap_plugin

© 2009-2018 by GPIUTMD