DURA Technology Used in Jetty Construction in Bum Bum Island, Sabah


Project: Construction of a Concrete Jetty Bridge at Balembang, Bum Bum Island, Semporna, Sabah.

(Pembinaan Jeti Dan Jambatan Konkrit Baru Di Balembang Pulau Bum Bum, Semporna, Sabah.)            

GPS Location: 4.477529 N; 118.627185 E

Structure Type: Approximate 240m long multiple span jetty, build with UHPC Composite Jetty System.

Superstructure Feature: 86 pieces of DURA® IB650-4.9m to 9.9m & 126 pieces of precast deck slab (Grade 60)

Substructure Feature: Combination of 44 nos. precast Grade 60 pier crosshead and in-situ RC pile cap and pre-bored 400mm dia. and 500mm dia. spun pile (Class C)

Client: KKLW    Logo KKLW

S.O.: Setiausaha Bahagian Teknikal

Consultant: Jurutera Perunding Daya S/B

Contractor: Matra Contractor

Contract Period: 12 months

Construction Status: Completed       

Project signboard and detail.
Dragon Inn resort 1.5km from Bum Bum jetty site.
Existing timber jetty 150m from the proposed new jetty site.
Existing timber jetty.
Proposed site for the construction of the 240m long concrete jetty.
Piling work in progress.
Piling work in progress.
Boring of holes for piles in progress.
Boring of holes for piles in progress.
Piling work in progress (14/03/2015).
Piling work in progress (28/03/2015).
Piling work in progress (28/03/2015).
Spun piles have been cut-off to the expected level (10/05/2015).
Spun piles have been cut-off to the expected level (10/05/2015).
Spun piles have been cut-off to the expected level (10/05/2015).
Unloading precast jetty components to smaller barge (30/08/2015).
All precast jetty components unloaded to the installation barge (31/05/2015).
All precast jetty components unloaded to the installation barge (31/05/2015).
A tog boat towing the barge to suitabel location.
Precast jetty components.
Assembling of precast jetty components.
Assembling of precast jetty components.
Assembling of precast jetty components.
Assembling of precast jetty components.
Assembling of precast jetty components.
Assembling of precast jetty components.
Piles at jetty head.
Jetty walk way mostly completed.
Preparation for in-situ concreting for RC column.
Preparation for in-situ concreting for RC column and roof beam (10/10/2015).
Preparation for in-situ concreting for RC pilec ap for jetty head (10/10/2015).
Concreting work in progress for jetty head pile cap (10/10/2015).
Bum Bum Island Jetty almost complete construction.
Bum Bum Island Jetty almost complete construction.
Bum Bum Island Jetty almost complete construction.
Bum Bum Island Jetty almost complete construction.
Bum Bum Island Jetty almost complete construction.
Completed Bum Bum jetty.
Completed Bum Bum jetty.
Completed Bum Bum jetty.
Project signboard and detail.