DURA Bridge Used in Replacement of Damaged Bridge in Batu Gajah, Perak


Project: To Replace Old Bridge Crossing Kinta River, at Batu Gajah/Gopeng Road, Kinta, Perak D.R. (N/PK/256/2015).


(Menggantikan Jambatan Menyeberangi Sungai Kinta, Jalan Batu Gajah/Gopeng, Kinta, Perak Darul Ridzuan. (N/PK/256/2015))

GPS Location: 4.467513N; 101.044985 E

Structure Type: Three Spans Composite Bridge System: 12m + 45m + 18m long x 16.3m wide.

Superstructure Feature: 11 pieces of DURA® IB650-12m, 11 pieces of DURA® IB650-20m & 4 pieces of DURA® UBG1750-45m

Substructure Feature: 2 nos. of cast in-situ RC abutments and 2 nos. of cast in-situ RC piers.

Foundation Feature: 300mm dia. micropiles

Loading Type: HA + KEL loading + 45 Units HB Loadings (BD37/01)

Client: Kerajaan Negeri Perak / JKR Perak    JKR

Consultant: Concrete Technology Sdn Bhd

Contractor: Kadek Bina Sdn Bhd (G6)

Contract Period: 18 months

Construction Status: Completed
Demolition of existing bridge crossing Sungai Kinta.
Existing bridge fully removed.
Pile load test in progress.
Pile load test in progress (020416).
Abutments and piers (181016).
Lifting of first DURA UBG1750-45m (261016).
Transporting second DURA UBG1750-45m (261016).
Lifting of second DURA UBG1750-45m (261016).
Lifting of second DURA UBG1750-45m (261016).
All four beams launched in position (271016).
Lifting of DURA IB650-18m using 20 tonnes mobile crane (011116).
Position of precast prestressed I-beam (011116).
Six number of IB650-18m positioned (011116).
A total of eleven IB650-18m launched in a day (011116).
Almost complete (060417).
Almost complete (060417).
Almost complete (060417).
Demolition of existing bridge crossing Sungai Kinta.