Project:
Construction of New Concrete Bridge at Indian Primary School Serendah, Hulu Selangor District, Selangor Darul Ehsan.  

(Pembinaan Jambatan Konkrit Bar ke Tapak Sekolah Rendah Tamil Serendah, Daerah Hulu Selangor, Selangor Darul Ehsan)

GPS Location: 3.367644N; 101.592685E

Structure Type: Single Span 22m x 5.5m Wide Composite Bridge System.

Superstructure Feature: 4 pieces of DURA® IB650-22m, with Cast In-Situ RC Deck

Substructure Feature: Cast in-situ RC Abutments

Foundation Feature: 300mm dia. Spun Pile (Class B)

Loading Type: HA+KEL and 30 units HB Loadings (BD37/01)

Client: JKR Selangor   JKR                         S.O.: JKR Hulu Selangor  JKR

Consultant: Jurutera Perunding Concrete Technology

Contractor: Generasi Teknik Sdn Bhd

Contract Period: 5 months

Construction Status: Completed
Existing bridge.
Debris collected at piers.
300mm Dia spun piles used.
Completed bridge after 2 years.
Existing bridge.
1/4 
start stop bwd fwd


(Pembinaan Jambatan Konkrit Bar ke Tapak Sekolah Rendah Tamil Serendah, Daerah Hulu Selangor, Selaogor Darul Ehsan)

GPS Location: 3.367644N; 101.592685E

Structure Type: Single Span 22m x 5.5m Wide Composite Bridge System.

Superstructure Feature: 4 pieces of DURA® IB650-22m, with Cast In-Situ RC Deck

Substructure Feature: Cast in-situ RC Abutments

Foundation Feature: 300mm dia. Spun Pile (Class B)

Loading Type: HA+KEL and 30 units HB Loadings (BD37/01)

Client: JKR Selangor                             S.O.: JKR Hulu Selangor  

Consultant: Jurutera Perunding Concrete Technology

Contractor: Generasi Teknik Sdn Bhd

Contract Period: 5 months