2017 Projects

DURA Light-Weigt Bridge System Used in Pos Hendrop


Project: To Upgrade Rural Road of 19KM at Pos Hendrop, Mukim Ulu Nenggiri, Gua Musang, Kelantan Darul Maim


(Menaiktaraf Jalan Kampung Sepanjang 19KM Di Pos Hendrop, Mukim Ulu Nenggiri, Gua Musang, Kelantan Darul Maim)

GPS Location
4.71685 N, 101.55253 E (Bridge 1); 4.718020 N, 101.55253 E (Bridge 2); 4.72700 N, 101.53364 E (Bridge 3);
                        4.730966 N, 101.51705 E (Bridge 4); 4.74706 N, 101.48913 E (Bridge 5); 4.747055 N, 101.48700 E (Bridge 6)

Structure Type:
Single Span 12 and 18m x 6m wide Composite Bridge System.

Superstructure Feature:
4 pieces of DURA® IB650-12m per bridge (Bridge 1 to 5) and 4 pieces of DURA® IB650-18m (Bridge 6)

Substructure Feature:
2 nos. of cast in-situ RC abutments per bridge

Foundation Feature: steel fiber reinforced mass concrete

Loading Type: HA + KEL loading + 30 Units HB Loadings (BD37/01)

Client: JAKOA    Jakoa New           S.O.: Felcra Berhad    felcra berhad

Consultant: Jurutera Perunding Marak Bersekutu

Contractor: Chengaljati Sdn Bhd

Contract Period: 29 months

Construction Status: Completed
Project signboard and detail.
Existing old bridge.
Existing old bridge.
Existing old bridge.
Unloading IB650-12m using one unit 20 tonnes mobile crane.
DURA beams and left-in formworks store at site office.
Completed bridge 1.
Completed bridge 1.
Soffit view of bridge 1.
Completed bridge 2.
Completed bridge 2.
Completed bridge 3.
Completed bridge 3.