New Pedestrian Bridge Crossing Jalan Lin Chen Mei, Sitiawan, Perak.

11
Project: To Construct a Pedestrian Bridge in-front of Nan Hwa Public School, Jalan Lin Chen Mei, Sitiawan, Perak Darul Ridzuan.


(Membina Jejantas Di Depan Sekolah Kebangsaan Nan Hwa, Jalan Lin Chen Mei, Sitiawan, Perak D.R.)


GPS Location: 4.203252 N, 100.698833 E

Structure Type: Single Span 29m x 2.2m wide Composite Bridge System with Precast Staircase.

Superstructure Feature: 1 pieces of DURA ® UBG1250-29m with Cast In-Situ RC Deck

Substructure Feature: RC Columns

Foundation Feature: 450mm Dia. Spun Piles (Class B)

Loading Type: 5 kPa (BD37/01)

Client: JKR Perak    JKR

Consultant: Jurutera Perunding Concrete Technology

Contractor: Belati Wangsa Sdn Bhd    belati wangsa

Contract Period: 12 months

Construction Status: Completed
450mm dia. Spun piles used as foundation.
End segment of DURA UBG1250.
Lean concrete newly casted.
Assembly of DURA UBG1250-29m near the main road.
DURA UBG1250-29m post-tensioned with 2-22S15 and 2-2S15 at the bottom and top flanges respectively.
Pier A.
Lifting of Dura U-girder (190916).
Dura U-girder was launched using two number of 120m tonnes mobile crane (190916).
Dura U-girder was launched using two number of 120m tonnes mobile crane (190916).
Elevation view of the launched beam (200916).
Completed Nan Hwa Footbridge (150317).
Completed Nan Hwa Footbridge (150317).
Completed Nan Hwa Footbridge (150317).
450mm dia. Spun piles used as foundation.