Project: To Construct Bridge at Sungai Peh from Kg. Bongor to Felda Bersia, Daerah Hulu Perak, Gerik, Perak Darul Ridzuan

(Membina Jambatan di Sungai Peh di Jalan Kg. Bongor Ke Felda Bersia, Daerah Hulu Perak, Gerik, Perak Darul Ridzuan.)

GPS Location: 5.4834361N, 101.198402E

Structure Type: Single Spans 20m by 7m Wide Composite Bridge System.

Superstructure Feature: 5 pieces of DURA® IB650-20m with Cast In-Situ RC Deck

Substructure Feature: Cast in-situ RC abutments

Foundation Feature: 200 x 200mm dia. SQ RC. pile (Class B)

Loading Type: HA+ 30 units HB loadings (BD37/01)

Client: Jabatan Tanah Gerik Malaysia

S.O.: Jabatan Tanah Gerik Malaysia

Consultant: JPCT

Contractor: Dura Technology Sdn Bhd

Contract Period: 3 months

Construction Status: Completed        

Existing road corssing Sg Peh.
Existing pipe culvert used at Sg. Peh.
Temporary crossing using three circular culverts.
Beam launching
Five numbers of DURA IB650-18m [ositioned on abutments.
Installation of DURA left-in formwork.
Completion of installation of beam and left-in formwork.
Preparation of steel reinforcement for the RC deck (1).
Concreting of bridge decking.
Backfilling of earth behind the abutments.
GI railing installed.
Approach road tarred.
Complete Single span 20m Sg Peh Bridge.
Complete Single span 20m Sg Peh Bridge.