Dura Pile Firstly Used in Canada, Lily River Detour Bridge
Project Title: Highway 11, Lily River Detour Bridge Near Kapuskasing, Ontario, Canada.
GPS Location: 49.4121111 N, -82.428639 W
Product: 6 Nos. of DURA® UHPC H-piles (Length = 9 m)
Client: Ontario Ministry of Transportation
Superintendent Officer.: LEA Consulting
Consultant: LEA Consulting
Contractor/designer: Facca Incorporated
Contract Period: 12 months
Construction Status: Completed Summer 2020
Replacement of 57 Years Old Bridge at Sungai Guntung, Setiu
Project: To Construct Bridge at Sungai Guntung, FT003/619/50, Setiu, Terengganu.
(Menggantikan Jambatan Sungai Guntung, FT003/619/50, Setiu, Terengganu)
GPS Location: 5.58656 N; 102.70621 E
Structure Type: Single Span 65m by 14m Wide Composite Bridge System.
Superstructure Feature: 3 pieces of DURA® UBG2500-65m with Cast In-Situ RC Deck
Substructure Feature: Cast in-situ RC abutments
Foundation Feature: 300mm dia. Micro Pile.
Loading Type: SV100 loadings (BS EN 1991-2-2003)
Client: Jabatan Kerja Raya Malaysia


Consultant: Primareka Consultants

Contractor: Dura Construction Sdn Bhd

Contract Period: 24 months
Construction Status: Completed