China First DURA Bridge - Guangzhou Bay Expressway


Project Title:
Guangzhou Bay Expressway, Sha Bei Interchange, Guangdong Province, China.

 GPS Location: 23.155963°N, 113.197917°E

Structure Type:  Single Span 16m by 8m Wide Composite Bridge System

Superstructure Feature: 6 pieces of ZhongLu-DURA® IB620-16m with 150mm thk. Cast In-Situ C50 RC Deck

Substructure Feature: No Change / Remain

Foundation Feature: No Change / Remain

Loading Type: First class load of highway 公路桥涵设计通用规范 (JTG D60-2015)

Client: Bei Huan Expressway Management Co., Ltd.

S.O.:

Consultant: Chongqing Jiaotong University Engineering Design Research Institute Co., Ltd.

Contractor: ZhongLu-Dura International Engineering Limited by Share Ltd   

Contract Period: 2 months

Construction Status: Completed

Cross-section of bridge
Mixer used for the fabrication of DURA beams.
DURA beams ready for transportation for site.
First Dura beam at China.
Pouring of UHPFRC into the mould.
80 tonnes mobile crane used for beam launching.
Lifting of DURA beam.
Placing of DURA UHPFRC left-in formwork.
Six Dura beams placed on the piers.
Left-in formwork placed in position.
China first Zhunglu-Dura UHPFRC beams launched successfully.
Project site.
Soffit view of the bridge.
In-situ C50 RC deck.
RC deck installed (290918)
Wearing coaurse laid (290918).
Cross-section of bridge