2019 Projects
China Foot Bridge 2 - Double Span 30m
Project: Extension and Reconstruction of Huadu Avenue (North Approach Junction of Airport to Cotton Tree Drive)
花都大道(机场北进路口至红棉大道段)扩建改造工程K11+915
GPS Location: 23.434114°E, 113.210209°N
Structure Type: Double Span 30m by 5.3m wide Double T-UHPC Bridge Girder
Superstructure Feature: 2 pieces of Double Tee-Integral Beam-Deck Bridge
Substructure Feature: Cast in-situ RC piers
Foundation Feature: 1m dia. Bored piles
Loading Type: 5 kPa
Client: 广州市花都区地方公路管理站 (Guangzhou Huada District Local Highway Management Station)
Consultant: 广州市公路勘察设计有限公司 (Guangzhou Highway Survey and Design Co. Ltd)
Contractor: 广东华隧建设集团股份有限公司 (Guangdong Hua Tunnel Construction Group Co. Ltd)