First DURA Bridge Used at Perak Tengah, Perak


Project: To Repalce Bridge at FT073/040/070 Crossing Bukit Berapit River, Perak Tengah, Perak D.R. 
MENGGANTIKAN JAMBATAN FT073/040/070 DI ATAS SUNGAI BUKIT BERAPIT, PERAK TENGAH, PERAK DARUL RIDZUAN.

GPS Location: 4.45073N; 100.94137E

Structure Type: Single span 16m long x 14m wide UHPC Intergal Beam-Deck System

Superstructure Feature: 9 pieces of DURA® TBG875-16m

Substructure Feature: 300mm dia. spun pile (Class B)

Client: JKR Perak    JKR

S.O.: JKR Daerah Perak Tengah

Consultant: Jurutera Perunding Concrete Technology (Alternative Design)

Contractor: CTSOO Ria Enterprise

Contract Period: 18 months

Construction Status: Completed

Project signboard and detail.
Road diversion.
Setting up for pile load test.
Dura beams fully lauched in half days (26/11/2014).
Casting of Dura stitching in progress. (18/12/2014).
All stitching are done in one day. (18/12/2014).
Approach slab casted. (18/12/2014).
Stitching formwork demould after one day. (19/12/2014).
Completion of Dura stitches. (19/12/2014).
Precast parapet has been installed on the new bridge.
Precast parapet has been installed on the new bridge.
Bridge is completed and open for traffic.
Completed bridge.
Completed bridge.
Completed bridge.
Completed bridge.
Soffit view of the completed bridge (04/10/2005).
Bridge plaque.
Project signboard and detail.