Staff Login



2022 Projects

IB650 for 20m single spans bridge at Tambunan Sabah

Project: To Construct a Concrete Bridge At Kg. Meluot Tampasak Liwan Tambunan, Sabah

(Cadangan Pembinaan Jambatan Konkrit Di Kg. Meluot Tampasak Liwan Tambunan, Sabah)

 
GPS Location: 5.816400 N; 116.491292 E

Structure Type: Single Spans 20m by 4.5m Wide UHPFRC integral beam-deck system.

Superstructure Feature: 3 pieces of DURA® IB850-20m

Substructure Feature: Cast in-situ RC abutments

Foundation Feature: 200mm x 200mm dia. SQ RC pile (Class B)

Loading Type: HA+ 30 units HB loadings (BD37/01)

Client: Jabatan Tanah Tambunan

S.O.: Jabatan Tanah Tambunan

Consultant: JPCT

Contractor: Sartini Contractor

Contract Period:

Construction Status: Completed   

Existing river and proposed bridge site.
Existing cable bridge.
RC pile used as foundation structure.
Uploading beam into the ship.
Uploading Ibeam onto the ship.
Unloading Ibeam to job site.
Three DURA Ibeam palced onto the abutment.
Deckslab of bridge.
Completed Bridge.
Completed Bridge.
Existing river and proposed bridge site.
01/10 
start stop bwd fwd

The New Bridge for "Washed Away" Kampung Sawa Bridge During 2014/2015 Massive Flood.


Project: To Construct a New Bridge In Kampung Sawa, and Related Works, Hulu Perak District, Perak D.R. (Post Flood). (PERS/752/2015)


(Membina Jambatan Baru Di Kampung Sawa, Dan Kerja-Kerja Yang Berkaitan, Daerah Hulu Perak, Perak D.R. (Pasca Banjir). (PERS/752/2015)


GPS Location: 5.210554 N, 101.071142 E

Structure Type: Four Spans 45m+45m+55m+35m x 5m Wide Composite Bridge System.

Superstructure Feature: 2 pieces of DURA ® UBG2000-45m, 1 piece of DURA ® UBG2000-55m, 1 piece of DURA ® UBG2000-35m, with Cast In-Situ RC Deck

Substructure Feature: Cast in-situ RC abutments and RC piers

Foundation Feature: 300mm dia. micropiles

Loading Type: HA+KEL or 30 units HB loadings (BD37/01)

Client: KKLW    Logo KKLW                         S.O.: JKR Hulu Perak    JKR

Consultant: N/A

Contractor: Lumut Project Management Sdn Bhd

Contract Period: 24 months (from 18 Jan 2016 to 18 Jan 2018)

Construction Status: Completed
Existing bridge at Kampung Sawa was destroyed by the year 2015 Dec massive flood.
Existing bridge at Kampung Sawa was destroyed by the year 2015 Dec massive flood.
Existing bridge at Kampung Sawa was destroyed by the year 2015 Dec massive flood.
Existing bridge at Kampung Sawa was destroyed by the year 2015 Dec massive flood.
Project signboard and detail.
Demolisation of existing concrete bridge.
Demolisation of existing concrete bridge.
Construction of 300mm diameter micropiles.
Construction of 300mm diameter micropiles.
Marking of position of micropile for pier 3.
Partially constructed pier 2.
Partially constructed substructures.
Transportation of UBG2000 girder segments.
Two segments positioned.
Six segments for second span positioned.
Positioning of end segment for first span.
Two numbers of UBG2000-45m already post-tensioned.
Two numbers of UBG2000-45m already post-tensioned.
Setting up giant crane for direct beam launching for UBG2000-55m.
Setting up of crane for beam launching.
Setting of crane for beam launching.
Setting of crane for beam launching.
Lifting of UBG2000-55m (140t) using a single lifting method.
Lifting of UBG2000-55m (140t) using a single lifting method.
Positioning UBG2000-55m.
Picking up last beam (UBG200-35m).
Swinging beam to the pier positions.
Positioning the last beam across Perak river.
UBG2000-35m positioned on the abutment B.
Beam launching completed.
Completed Kg. Sawa Bridge.
Completed Kg. Sawa Bridge.
Completed Kg. Sawa Bridge.
Completed Kg. Sawa Bridge.
Existing bridge at Kampung Sawa was destroyed by the year 2015 Dec massive flood.
01/34 
start stop bwd fwd


© 2009-2023 by GPIUTMD