To Build a New Bridge at Kg. Iboi, Mukim Kupang, Baling, Kedah using DURA IB1000 - 24m

Project: KERJA-KERJA PEMBINAAN JAMBATAN BARU SERTA KERJA LAIN YANG BERKAITAN DI KG. IBOI, MUKIM KUPANG, BALING, KEDAH.

(To Build New Bridge and Other Works at Kg. Iboi, Mukim Kupang, Baling, Kedah)

GPS Location: 5.428969, N; 116.233322 E

Structure Type: Single Spans 24m by 4.5m Wide Composite Bridge System.

Superstructure Feature: 3 pieces of DURA® IB1000-24m, with Cast In-Situ RC Deck

Substructure Feature: Cast in-situ RC piers

Foundation Feature: 300mm Dia. Micro Piles

Loading Type: HA+ KEL & 30 units HB loadings (BD37/01)

Client: JPS Malaysia

S.O.: JPS Malaysia

Consultant:

Contractor: Efan Bakti Enterprise

Contract Period: 18 months

Construction Status: Completed

1
2
3
4
5
6
7
8
1/8 
start stop bwd fwd

To Build a New Bridge at Telok Panglima Garang, Daerah Kuala Langat, Selangor using DURA IB850 - 14.8m

Project: PEMBINAAN JAMBATAN DI PT 9723 (LOT ASAL 13245) MUKIM TELOK PANGLIMA GARANG, DAERAH KUALA LANGAT, SELANGOR DARUL EHSAN

(To Build Bridge at PT 9732 (ORIGINAL LOT 13245) Mukim Telok Panglima Garang, Daerah Kuala Langat, Selangor Darul Ehsan)

 GPS Location: 2.9498497 N, 101.4273718 E

Structure Type: Single Spans 16m by 11.9m Wide Composite Bridge System.

Superstructure Feature: 6 pieces of DURA® IB850-14.8m, with Cast In-Situ RC Deck

Substructure Feature: Cast in-situ RC piers

Foundation Feature: 300mm Dia. Spun Piles (Class B)

Loading Type: HA+ KEL & 45 units HB loadings (BD37/01)

Client: Pro Active Synergy Sdn Bhd

S.O.: Perunding CSS

Consultant: Perunding CSS

Contractor: ECO APEX

Contract Period: 18 months

Construction Status: Completed

1
2
3
4
5._Completed_launching_of_3_nos
6
7
8
9
Completed bridge.
01/10 
start stop bwd fwd

To Build a New Utilities Bridge for Water Pipe Crossing Using DURA UBG1250 - 38m

Project: PEMBINAAN JAMBATAN UNTUK AIR PIPE MENYEBERANGI SUNGAI DAN KERJA-KERJA UNTUK PACKAGE 1 (CH+800 TO CH29+800) UNTUK AIR BEKALAN DARI KEMAMAN, TERENGGANU TO GEBENG, PAHANG UNTUL EAST COAST ECONOMIC REGION DEVELOPMENT CONCIL (ECERDC) – SG. BALOK 

(THE PROPOSED CONSTRUCTION AND COMPLETION OF PACKAGE 1 (CH8+000 TO CH29+800) FOR PIPELINE, BOOSTER PUMP STATION AND ASSOCIATED WORKS FOR THE WATER SUPPLY PROJECT FROM KEMAMAN, TERENGGANU TO GEBENG, PAHANG FOR EAST COAST ECONOMIC REGION DEVELOPMENT COUNCIL (ECERDC))


GPS Location: 3.987392 N; 103.388043 E

Structure Type: Single Span 38m by 2.6m (Avg.) Wide Composite Bridge System For Water Pipe Crossing.

Superstructure Feature: 1 pieces of DURA® UBG1250-38m with Cast In-Situ RC Deck

Substructure Feature: Cast in-situ RC abutments

Foundation Feature: 300mm dia. Spun Piles (Class B)

Loading Type: Water Pipe Load + 3 kPa Maintenance Load

Client: Pengurusan Air Pahang Berhad

S.O.: KLCC Projeks Sdn Bhd

Consultant: HLA Associates Sdn Bhd

Contractor: Leika Sdn Bhd

Contract Period:

Construction Status: Completed    

Casting of abutment.
Casting of abutment.
Inserting strands for stitching and stressing.
Stressing of DURA UBG1250 - 38m.
Launching of DURA UBG1250.
Completed launching of DURA UBG1250.
Completed bridge for pipe rack.
Completed bridge for pipe rack.
Completed bridge for pipe rack.
Completed bridge for pipe rack.
Casting of abutment.
01/10 
start stop bwd fwd

To Replace Collapsed Bridge Using DURA Shallow Beams 300x400 - 10m at Kg. Bukit Kulim, Selama, Perak.

Project: (To Build New Bridge at Kampung Bukit Kulim, Mukim Hulu Ijok, Selama, Perak)

(KERJA SELENGGARA JAMBATAN KAMPUNG BUKIT KULIM SERTA LAIN-LAIN KERJA BERKAITAN, MUKIM HULU IJOK, SELAMA, PERAK)

 GPS Location:  5.150458N; 100.885704E

Structure Type: Single Spans UHPFRC Beam Composite In Situ Deck Bridge System: 10m x 3.5m wide.

Superstructure Feature: 7 pieces of DURA® Shallow Beams 300 x 400 - 10m with Cast In-Situ RC Deck

Substructure Feature: 2 nos. of Cast in-situ RC abutments

Foundation Feature: 200mm x 200mm dia. SQ RC pile (Class B)  

Loading Type: HA+KEL or 30 units HB loadings

Client: Jabatan Tanah Selama

S.O.: Jabatan Tanah Selama

Consultant: Concrete Technology Consult Sdn Bhd

Contractor: Sadan Works Enterprise

Contract Period: 4 months

Construction Status: Completed

Existing bridge collapsed.
Site condition of new bridge.
Completed abutment.
Completed abutment.
Completed abutment and ready for beam sitting.
Completed bridge.
Completed bridge.
Existing bridge collapsed.
1/7 
start stop bwd fwd

To Build a New Footbridge for Sekolah Rendah Agama Batu 4, Jalan Kapar (FT005) Klang, Selangor

Project: To Construct a Pedestrian Bridge in front of Sekolah Rendah Agama BT.4 at Jalan Kapar (FT005) Klang, Selangor

 (Membina Jejantas Pejalan Kaki DI Hadapan Sek. Rendah Agama BT.4, Jalan Kapar (FT 005), Klang, Selangor)

GPS Location: 3.077175 N; 101.405815 E

Structure Type: Two Spans 38.75m by 2.5m and 16.26m by 2.5m Wide UHPFRC Composite Bridge System with UHPFRC Precast Staircase

Superstructure Feature: 1 pieces of DURA® UBG1500-38.75m, DURA® UBG1500-16.26m with Cast In-Situ RC Deck

Substructure Feature: RC Columns

Foundation Feature: 400mm Dia. Spun Piles (Class B)

Loading Type: 5 kPa (BD37/01)

Client: JKR Malaysia JKR

S.O.: JKR Klang JKR

Consultant: Concrete Technology Consult Sdn Bhd

Contractor: Phachaslat Enterprise

Contract Period: 24 Months

Construction Status: On-going          

Site condition.
Launching of UBG1500.
Launching of UBG1500.
Completed launching of UBG1500.
Completed footbridge.
Completed footbridge.
Completed footbridge.
Site condition.