Project
: To construct a New Bridge from Kg Baharu to Kg. Teluk, Manjung District, Perak D.R.

(Membina Jambatan Dari Kg. Baharu Ke Kg. Teluk, Daerah Manjung, Perak Darul Ridzuan)

GPS Location: 4.30526N, 100.68380E

Structure Type: Ten multiple spans of 42m x 13.6m wide UHPdC composite bridge, total length of 420m.

Superstructure Feature: 20 pieces of DURA® UBG2000-41.5m topped with 300mm thk in-situ RC deck slab

Substructure Feature: 600mm diameter spun piles (Class B)

Client: Jabatan Perdana Menteri, The Prime Minister Office    JPM2

Consultant: Jurujati Konsultant Sdn Bhd

Contractor: Megat Ahmad Shahrani Sdn Bhd    megat ahmad

Contract Period: 2 years

Status: Completed

Project sign board.
Original site at Kampung Baharu.
Original site at Kampung Teluk.
Typical cross-section view.
First half of the bunk constructed (01/05/2013).
The canal full of mangrove trees.
1st maintain load test carried out at abutment section (07/06/2013).
Moulding for UBG2000.
1st prototype of internal segment (20/08/2013).
Foundation for pier 1.
Unloading and assembling of first end segment of UBG2000-41.5m (13/09/2013).
Three numbers of UBG2000 beams assembled (27/09/2013).
Post -tensioning work in progress for UBG2000-41.5m (06/02/2014).
Post-tensioning work completed.
Columns/ pier cross-head under construction (26/04/2014).
Columns/ pier cross-head under construction (26/04/2014).
Substructures/piers/abutments (27/03/2015).
Post-tensioning work in progress for DURA beam at Kg. baharu site (15/05/2015).
Installing anchorage bearing plates.
Jacking of tendons in progress (16/05/2015).
Beam launching in progress.
Beam launching in progress.
Beam launching in progress.
Beam launching in progress.
Beam launching in progress.
Ten UBG2000-42m (or five spans) launched.
Ten UBG2000-42m (or five spans) launched.
Twenty UBG2000-42m girder (or ten spans) launched in position.
Timber formwork used as in-situ RC decking.
Reinforcement of RC deck.
Construction of RC deck in progress.
Top view of RC deck.
Construction of RC deck in progress.
Newly completed Kampung Baharu-Kampung Telok Bridge.
420m long UHPC composite bridge.
420m long UHPC composite bridge.
Project sign board.
01/36 
start stop bwd fwd




contentmap_plugin