panaroma

Project
: Menaiktaraf Jalan Dari Kok Lanas Ke Sek. Banggol Saman Ke Sek. Danang, Kereteh, Pasir Putih, Kelantan. Fasa 2. (Bridge 2)

GPS Location: 5.921996N, 102.307015 E

Structure Type: Single span 40m long x 12m wide DURA composite bridge.

Superstructure Feature: 2 pieces of DURA UBG1750-40m

Substructure Feature: Cast in-situ RC abutments

Foundation Feature: 500mm dia. PC Spun Pile (Grade80, Class B)

Loading Type: Full HA + KEL & 45 units HB loadings

Client: KKLW    Logo KKLW

Consultant: M Zah Perunding

Contractor: Jemmings Sdn Bhd

Contract Period: 24 months

Status: Completed         

Proposed single span 40m road bridge.
Transporting UBG1750-40m for beam launching (08/04/2015).
Transporting UBG1750-40m for beam launching (08/04/2015).
Lifting of the Precast Dura U beam (08/04/2015).
Lifting of the Precast Dura U beam (08/04/2015).
DURA U beam seated on the plinth (08/04/2015).
Timber formwork used for the in-situ concrete decking.
Complete single span 40m long Kok Lanas Bridge.
Complete single span 40m long Kok Lanas Bridge.
Proposed single span 40m road bridge.
1/9 
start stop bwd fwd