Project: To Comstruct a Pedestrian Bridge at the Animination Theme Park at Ipoh.
 
(Membina 1 Unit Bangunan Pintu Masuk Satu (1) Tingkat, 1 Unit TNB Substation 11/0.4kV, 6 Unit ‘Drop off’’ Berbumbung,  unit Pintu Gerbang, 634 unit Tempat Kereta, 92 unit Tempat Letak Motosikal, 16 unit Tempat Letak Bas di atas Plot E, di Zon 6 Bandar Meru Raya, Mukim untuk: Tetuan Animation Theme Park Sdn. Bhd. (Pedestrian Bridge))        

GPS Location: 4.663077N; 101.08444E

Structure Type: 120m long multiple span pedestrian bridge, come with UHPC Composite Bridge System

Superstructure Feature: 24 pieces of DURA® IB650-19.5m

Substructure Feature: In-situ RC pile cap and 500mm dia. spun pile (Class C)

Client: Animation Theme Park Sdn. Bhd. animation. theme park

S.O.: The Sanderson Design Group (Malaysia) Sdn. Bhd.5283dcf00b5e5-sanderson-logo

Consultant: Jurutera Perunding Concrete Technology (Alternative Design)

Contractor: Maltecon Builder Sdn. Bhd.

Contract Period: 12 months

Construction Status: Completed        

Project detail of animation theme park at Ipoh.
Illustration of completed animation theme park studio.
Piling work in progress for the pedestrian bridge (05/12/2014).
Piling work in progress for the pedestrian bridge (05/12/2014).
Pouring concrete into temporary formwork for pier crosshead. (29/12/2014).
Pier crosshead completed. (30/12/2014).
Pier crosshead completed. (30/12/2014).
8 nos of Dura IB-650 launched (19/01/2015).
The completed bridge (01/07/2015)
The completed bridge (01/07/2015)
The completed bridge (01/07/2015)
The completed bridge (01/07/2015)
Soffit view of the pedestrian bridge (01/07/2015).
Ipoh Animation Themepark main bridge crossing the central lake.
Ipoh Animation Themepark main bridge crossing the central lake.
Ipoh Animation Themepark main bridge crossing the central lake.
Project detail of animation theme park at Ipoh.