Project: To Construct a Service Bridge at Animation Theme Park, Ipoh.

(Projek Cadangan membina 1 unit Bangunan Pintu Masuk satu (1) tingkat, 1 unit TNB substation 11/0.4kV, 6 unit ‘Drop off’’ Berbumbung, unit Pintu Gerbang, 634 unit Tempat Kereta, 92 unit Tempat Letak Motosikal, 16 unit Tempat Letak Bas di atas Plot E, di Zon 6 Bandar Meru Raya, Mukim untuk: Tetuan Animation Theme Park Sdn. Bhd. (Service Bridge))

GPS Location: 4.660873N; 101.08404E

Structure Type: 16m long single span service bridge, come with UHPC Composite Bridge System

Superstructure Feature: 7 pieces of DURA® IB650-16m

Substructure Feature: In-situ RC pile cap and 300mm dia. spun pile (Class B)

Client: Animation Theme Park Sdn. Bhd. animation. theme park

S.O.: The Sanderson Design Group (Malaysia) Sdn. Bhd.5283dcf00b5e5-sanderson-logo

Consultant: Jurutera Perunding Concrete Technology (Alternative Design)

Contractor: Maltecon Builder Sdn. Bhd.

Contract Period: 12 months

Construction Status: Completed

Pile cap completed (17/12/2014).
7 pieces of DURA® IB650-16m delievering to site (2/1/2015).
7 pieces of DURA® IB650-16m arrived at site (2/1/2015).
Launching DURA® IB650-16m onto abutment (2/1/2015).
Launching DURA® IB650-16m onto abutment (2/1/2015).
7 pieces of DURA® IB650-16m launched (2/1/2015).
7 pieces of DURA® IB650-16m launched (2/1/2015).
Formwork for end diaphragm is buillt.
End Diaphragm and deck has been casted and temporary formwork is built for G.I. galvanized steel railing.
Completed service bridge (01/07/2015).
Completed service bridge (01/07/2015).
Completed service bridge (01/07/2015).
Completed service bridge (01/07/2015).
Pile cap completed (17/12/2014).