: Flood Mitigation Plan at Bertam Valley Cameron Highlands, Pahang. Project in Widening & Deepening Bertam River & Other Related Works  - Bridge JK 1 & 2.

(Rancangan Tebatan Banjir Lembah Bertam Cameron Highlands, Pahang. Project Melebar Dan Mendalamkan Sungai Bertam Dan Kerja-Kerja Berkaitan - Bridge JK 1 & 2).

Nos. of Bridges: 2

GPS Location
: 4.413677N, 101.402563 E (JK Bridge 1); 4.413767N, 101.405086 E (JK Bridge 2).

Structure Type: Single span 30m long x 5.5m wide DURA U-trough bridge

Superstructure Feature: 1 piece of DURA® UTG1500-30.0m per bridge

Substructure Feature: Cast in-situ RC abutments

Foundation Feature: 300mm dia. Spun pile (Class B)

Loading Type: Combination of HA + KEL & 30 units HB loadings (BD37/01)

Client: JPS Malaysia

S.O.: JPS Cameron

Consultant: Jurutera Perunding Concrete Technology (Alternative Design)

Contractor: Jutabina Sempurna Sdn Bhd / Maltecon Builder Sdn. Bhd.

Contract Period: 12 months

Construction Status: Completed
JK1: Piling completed.
JK1: Construction of abutments (20/07/2015).
JK1: Construction of abutments (20/07/2015).
JK1: Intermediate concrete block used as temperory support for the assembly of girder segments (02/11/2015).
JK1: Uploading first UTG1500 segment using two units 20 tons capacity mobile cranes.
JK1: Transporting first segment for assembly (02/11/2015).
JK1: Lifting of first UTG segment using one unit 45 tons capacity mobole crane (02/11/2015).
JK1: Positioning first segment.
JK1: Positioning second segment.
JK1: Three segments aligned.
JK1: Three segments aligned.
JK1: Five segments aligned.
JK1: 30m long UTG girder fully assembled (03/11/2015).
JK1: 30m long UTG girder fully assembled (03/11/2015).
JK1: 27K15 tendon used at bottom flange.
JK1: A single span 30m UTG1500 fully post-tensioned.
JK1: All temporary intermediate concrete supports were removed.
JK1: A 10 wheelers lorry crossing the bridge.
JK1: An excavator crossing the bridge.
Completed JK2 bridge.
Completed JK1 bridge using UTG1500-30m.
Completed JK1 bridge using UTG1500-30m.
Completed JK1 bridge using UTG1500-30m.
Completed JK1 bridge using UTG1500-30m.
Completed JK1 bridge using UTG1500-30m.
JK1: Piling completed.