Project: A Proposal to Replaced an Old Bridge at Sunga Linggi, Jalan Rantau-Siliau, Rantau, Seremban District, Negeri Sembilan.


(Cadangan Menggantikan Jambatan di Atas Sg. Linggi, Jalan Rantau- Siliau, Mukim Rantau, Daerah Seremban, Negeri Sembilan.)

Structure Type: 51.8m long x 18.6m wide UHPdC composite bridge crossing Sg. Linggi

Superstructure Feature: 5 pieces of DURA® UBG1750-51.5m topped with 200mm thk in-situ RC deck

Substructure Feature: 800mm diameter bored pile

Loading Type: Full HA+45HB loading (BD37/01)

Client: JKR Negeri Sembilan   JKR          Consultant: Endeavour Consult Sdn Bhd   endevour consult

Contractor: Midland Classic Sdn Bhd

Contract Period: 12 months

Construction Period: Completed

Original site and old concrete bridge come with 4 row of piers in the waterway of the Sg. Linggi (13/10/2011).
Existing utility and pipings.
Debris stuck at the piers (13/10/2011).
Debris stuck at the piers (05/08/2012).
Project signboard and project detail near the job site.
Site clearing began (05/08/2012).
Construction of abutment in progress (15/02/2013).
Construction of abutment in progress (07/04/2013).
Installation of strands for post-tension U beam (07/04/2013).
Partially completed abutment (20/04/2013).
Post-tensioning work in progress in 1st U beam (29/04/2013).
Post-tensioning work in progress in 1st U beam (29/04/2013).
Completion of 1st U beam PT work.
Post-tensioning work in progress in 1st U beam (29/04/2013).
Platform preapration for crane seating (18/05/2013).
Arrival of 500 tonnes capacity all terrain mobiel crane by Asiagroup (18/05/2013).
During beam lifting (20/05/2013).
During beam lifting (20/05/2013).
Five DURA U beam launched.
Five DURA U beam launched.
Preparation of formwork for in-situ RC decking (15/06/2013).
Preparation of formwork for in-situ RC decking (15/06/2013).
Fixing of end-diaphragm reinforcement.
Insitu deck slab completed (12/09/2013).
Completed 52m long single span Rantau-Siliau bridge.
Completed 52m long single span Rantau-Siliau bridge.
Column free new bridge crossing Sg Linggi.
Completed 52m long single span Rantau-Siliau bridge.
Original site and old concrete bridge come with 4 row of piers in the waterway of the Sg. Linggi (13/10/2011).