Login Form



Single Span UHPC Bridge used at Bukit Gambir (Bridge 1) , Johor

Project   : To Change a Narrow and Old bridge at KM 1.9, 3.3, 4.9 and 7.4 Jalan Sengkang, Bukit Gambir (J143), Ledang Johor, Johor Darul Takzim.

(Cadangan Menggantikan Jambatan Sempit Di KM 1.9, 3.3, 4.9 Dan 7.4 Jalan Sengkang, Bukit Gambir (J143), Ledang Johor, Johor Darul Takzim)

GPS Location: 2.2312473 N; 102.6607008 E (Bridge 1)

Structure Type: Single Span UHPC I Beam Composite In Situ Deck Bridge System : 18m x 12.5m wide.

Superstructure Feature: 9 pieces of DURA® IBeam650-18m

Substructure Feature: 2 nos. of cast in-situ RC abutments and 2 nos. of cast in-situ RC piers.

Foundation Feature: 300mm dia. Spun pile (Class B)

Loading Type: HA + 45 units HB loadings (BD37/01)

Client: JKR Johor   JKR

S.O.: JKR    JKR

Consultant: Perunding Sejati Sdn Bhd

Contractor: Golden Kluang Sdn. Bhd.

Contract Period: 24 months

Construction Status: Under Construction       

Demolition and site clearing work.
Piling of 60mm spun pile.
Bridge site.
Piling work completed.
Abutments (221217).
Plint seating and dowel bars are ready (221217).
Lifting of beams using two mobule cranes 220118).
Two beams positioned.
Four beams positioned.
Positioning 6th beams.
Positioning 7th beams.
All 9 beams launched within 2 hours.
All beams launched.
Demolition and site clearing work.
01/13 
start stop bwd fwd


contentmap_plugin

© 2009-2018 by GPIUTMD