Single Span UHPFRC Bridge for (Bridge 2) Bukit Gambir, Ledang Johor.


Project   : To Change a Narrow and Old bridge at KM 1.9, 3.3, 4.9 and 7.4 Jalan Sengkang, Bukit Gambir (J143), Ledang Johor, Johor Darul Takzim (Bridge 2).


(Cadangan Menggantikan Jambatan Sempit Di KM 1.9, 3.3, 4.9 Dan 7.4 Jalan Sengkang, Bukit Gambir (J143), Ledang Johor, Johor Darul Takzim)
 
GPS Location: 2.2421633 N; 102.6667053 E (Bridge 2)

Structure Type: Single Span UHPC I Beam Composite In Situ Deck Bridge System: 18m x 12.5m wide.

Superstructure Feature: 9 pieces of DURA® IBeam650-18m

Substructure Feature: 2 nos. of cast in-situ RC abutments and 2 nos. of cast in-situ RC piers.

Foundation Feature: 450mm dia. Spun pile (Class B)

Loading Type: HA + 30 units HB loadings (BD37/01)

Client: JKR Johor  JKR              S.O.: JKR  JKR

Consultant: Perunding Sejati Sdn Bhd

Contractor: Golden Kluang Sdn. Bhd.

Contract Period: 24 months

Construction Status: Under Construction       

600mm dia, spun piles used as foundation.
600mm dia, spun piles used.
Construction if abutments.
Bridge site.
Construction of abutments.
Abutment A.
Beam launching in progress using mibile cranes (231217).
Positiong of precast beams on the abutments (231217).
Lifting of 5th beams using two units of 20 tonnes mobile crane (231217).
All Dura IB650-18m are launched in position (231217).