Login Form



Replacement of 57 Years Old Bridge Project at Sungai Raia, Kinta


Project: To Construct Bridge at Sungai Raia, FT001/583/20, Kinta, Perak.

 
(Menggantikan Jambatan Sungai Raia, FT001/583/20, Kinta, Perak)

GPS Location: 4.51582 N; 101.13747 E

Structure Type: Single Span 50m by 11m Wide Composite Bridge System.

Superstructure Feature: 3 pieces of DURA® UBG1750-50m with Cast In-Situ RC Deck

Substructure Feature: Cast in-situ RC abutments

Foundation Feature: 300mm dia. Micro Pile.

Loading Type: SV100 loadings (BS EN 1991-2-2003)

Client: Jabatan Kerja Raya Malaysia   JKR                 S.O.: JKR Daerah Kinta JKR

Consultant: Primareka Consultants  prima reka                  Contractor: Dura Construction Sdn Bhd  4 DURA Construction 2

Contract Period
: 24 months

Construction Status
: Under Construction

Project signboard for Sg. Raia Bridge
Existing Sg Raia Bridge.
Existing old bridge.
Micropiles used as foundation.
Maintain load testing in progress.
Construction of micropiles at abutment B completed (011018).