Login Form



Replacement of 57 Years Old Bridge at Sungai Guntung, Setiu


Project:  To Construct Bridge at Sungai Guntung, FT003/619/50, Setiu, Terengganu.


(Menggantikan Jambatan Sungai Guntung, FT003/619/50, Setiu, Terengganu)

GPS Location: 5.58656 N; 102.70621 E

Structure Type: Single Span 65m by 14m Wide Composite Bridge System.

Superstructure Feature: 3 pieces of DURA® UBG2500-65m with Cast In-Situ RC Deck

Substructure Feature: Cast in-situ RC abutments 

Foundation Feature: 300mm dia. Micro Pile.

Loading Type: SV100 loadings (BS EN 1991-2-2003)

Client: Jabatan Kerja Raya Malaysia JKR                S.O.: JKR Daerah Setiu JKR

Consultant: Primareka Consultants  prima reka

Contractor: Dura Construction Sdn Bhd  4 DURA Construction 2

Contract Period: 24 months

Construction Status: Under Construction

Project Signboard.
Existing Sg. Guntung bridge built in 1961.
Existing Sg. Guntung bridge built in 1961.
Sg Guntung Bridge at FT003-619-50.
Project Signboard.
1/4 
start stop bwd fwd


contentmap_plugin

© 2009-2018 by GPIUTMD