Single Span UHPC Bridge at Ulu Lawin, Perak


Project: To Construct Bridge at Ulu Lawin, Daerah Hulu Perak, Gerik, Perak Darul Ridzuan.


 (Membina Jambatan Ulu Lawin, Daerah Hulu Perak, Gerik, Perak Darul Ridzuan).

 GPS Location: 5.300921 N; 101.052175 E 

Structure Type: Single Span UHPC Beam Composite In Situ Deck Bridge System : 18m x 4m wide.

Superstructure Feature: 3 piece of DURA® IB650-18m with Cast In-Situ RC Deck

Substructure Feature: 2 nos. of cast in-situ RC abutments

Foundation Feature: 200mm x 200mm RC pile.

Loading Type: HA+KEL or 30 units HB loadings

Client: Pejabat Daerah Dan Tanah, Hulu Perak, Gerik Perak

S.O.: Jurutera Daerah , JKR Daerah Perak JKR

Consultant
: Jurutera Perunding Concrete Technology

Contractor: FD Construction and Supplier

Contract Period: : 3 Months

Construction Status: Under Construction
Sg Lawin.
RC square pile used as foundation.
RC piles installed.
Construction of RC abutments.
Abutments done and ready for beam launching.
Transportation of Dura I-beam to site and ready for beam launching (110618).
Three I-beams launched on to abutments.
Installation of left-in formwork onto DURA I-beams.
Construction of In-situ RC decking (060918).
Sg Lawin.