Partial UHPFRC Box Girder Design Used at Eight Spans Bridge at Kampung Lambor Crossing Sg. Perak

  
Project: To Construct Bridge at Lambor (Crossing Sungai Perak).


(Membina Jambatan Menghubungkan Kg. Lambor Kiri Ke Kg. Lambor Kanan (Merentasi Sg. Perak).

GPS Location: 4.269773 N, 100.901552 E

Structure Type: Eight Span 404m by 11.5m Wide Composite Bridge System.

Superstructure Feature: 8 piece of DURA® GUBG2000-50m with Cast In-Situ RC Deck

Substructure Feature
: Cast in-situ RC abutments

Foundation Feature: 600mm dia. Spun Pile (Class B). 

Loading Type: LM1 & LM3 (SV100)

Client: Jabatan Kerja Raya Malaysia  JKR
S.O.: JKR Daerah Perak Tengah   JKR

Consultant: JKR Malaysia JKR

Contractor: Everfine Resources Sdn Bhd

Contract Period: 24 Months

Construction Status:  Under Construction