Login Form



Dura U Beams Firstly Used in LLM Project- Duke 3 Section 2


Project: Setiawangsa– Pantai Expressway (SPE) – DUKE Phase 3
(Pier 66 to Pier 72) for Mainline (Section 2– Salak To Pandan)

 (Setiawangsa – Pantai Expressway (SPE) – Duke Fasa 3 (Pier 66 To Pier 72) For Mainline (Section 2 – Salak To Pandan)

GPS Location
: 3.135618 N; 101.719546 E

Structure Type: Triple Span 186m by 16.6m (Avg.) Wide Two Level Composite Bridge System.

Superstructure Feature: 5 pieces of DURA® UBG2500s-55m – 60m with Cast In-Situ RC Deck

Substructure Feature: Cast in-situ RC piers

Foundation Feature: 1.2m Dia. Bored Piles

Loading Type: HA+ 45 units HB loadings (BD37/01)

Client: Lembaga Lebuhraya Malaysia (LLM)  Logo Lembaga Lebuhraya Malaysia

S
.O.: Lembaga Lebuhraya Malaysia (LLM)  Logo Lembaga Lebuhraya Malaysia

Consultant: Jurutera Perunding RiZ Sdn Bhd (alternatvie design)

Contractor: Ekovest Construction Sdn Bhd  EKOVESTlogo

Contract Period:

Construction Status: Under Construction
contentmap_plugin

© 2009-2018 by GPIUTMD