Malaysian Dura UHPC Used at Sydney Most Iconic Sydney Habour Bridge
Project:Supply and Placement of Ultra-high Performance Fibre Reinforced Concrete (UHPFRC) for Sydney Harbour Bridge Railway Deck Upgrade – Northern and Southern Span. The work is to install formwork, place precast panel bedding and place Ultra-high Performance Fibre Reinforced Concrete as a joint filler; for the construction of a new precast railway deck on the South Approach and North Approach of the Sydney Harbour Bridge.
GPS Location: -33.852232°S; 151.210853°E
Structure Type: Australian heritage-listed steel two-pin arch construction, made up of two arches side by side, joined by horizontal cross-members.
Dimensions:
Total length : 1,149m (3,770 ft)
Width : 48.8m (160 ft)
Height : 134m (440 ft)
Longest span : 503m (1,650 ft)
Superstructure Feature: Construction of UHPFRC pedestals on precast concrete panels for rail plates and placing DURA-Rapid Ultra-high Performance Fibre Reinforced Concrete as a joint filler in shear connectors pockets and between precast panels.
Loading Type: AS5400 Train Load
Client: Sydney Trains, Transport for New South Wales, Australia
S.O.: Sydney Trains
Consultant: Jacobs (https://www.jacobs.com/)
Contractor: Various, Dura Marketing Pty Ltd as supplier and technical support for Ultra-high Performance Fibre Reinforced Concrete (UHPFRC)
Contract Period: On-Going
Construction Status: In between construction periods
Works to be delivered during shutdowns and weekend possessions over a number of years
New Extension Road Bridge 22m Batu Kawan Bridge 2
Project: PELEBARAN JAMBATAN BATU KAWAN SEDIADA MERENTASI SUNGAI JEJAWI DI BATU KAWAN SEBERANG PERAI SELATAN, PULAU PINANG (BRIDGE 2)
(New Extension and Widening of Road Bridge of Sungai Jawi Bridge.)
GPS Location: 5.264273, N; 100.441121 E
Structure Type: Single Span 22m by 40m Wide Composite Bridge System.
Superstructure Feature: 27 pieces of DURA® IBEAM 850-22m with Cast In-Situ RC Deck
Substructure Feature: Cast in-situ RC piers
Foundation Feature: Spun Pile 450mm
Loading Type: HA+ KEL & 45 units HB loadings (BD37/01)
Client: Penang Development Corporation (PDC)
S.O.: Jabatan Kerja Raya (JKR)
Consultant: M.E.I Consultants Sdn Bhd.
Contractor: Zibina Jaya Sdn Bhd
Contract Period:
Construction Status: Under Construction
63m New Bridge Build in Kg. Sepah , Johor
Project: To Build A New Bridge At Kampung Sepah Beruang Benut, Pontian, Johor)
(Membina Jambatan Baru Di Kampung Sepah Beruang Benut, Pontian, Johor)
GPS Location: 1.639795 N; 103.261916 E
Structure Type: Three Spans 63m by 5m Wide UHPFRC integral beam-deck system.
Superstructure Feature: 6 pieces of DURA® IBeam850-20m 3 pieces of DURA® IBeam850-23m
Substructure Feature: Cast in-situ RC abutments
Foundation Feature: 600mm dia. Spun pile (Class B)
Loading Type: HA+ 30 units HB loadings (BD37/01)
Client: JPS Malaysia
S.O.: JPS Johor
Consultant: JPCT
Contractor: Kamy Sejahtera Enterprise
Contract Period:
More Articles...
- Upgrading the Bridge at Sungai Menora for 52m UHPFRC
- 55m Bridge of Single Spans in Paitan Sabah
- Sungai Muda , Kedah Concrete Bridge using Dura UHPFRC
- DURA 70m Girder Used at Duke , Section 2 Interchange 3 Ramp 3A
- DURA Long Span U Girder Used in Duke 3 Section 2 from Pier 21 to Pier 50
- Dura U Beams Firstly Used in LLM Project- Duke 3 Section 2
- Malaysia Vision Valley (MVV) Road Bridge from Nilai-Labu to Bandar Enstek
- Replacing Jambatan Buloh using UHPFRC Accelerate Bridge Construction (ABC) Method
- Dura IB650 for the New Bridge in Sg. Mulong
- Accelerated Bridge Construction (ABC) System Used at Busy Sungai Rambai Kecil Bridge