Replacement of 57 Years Old Bridge at Sungai Guntung, Setiu


Project:  To Construct Bridge at Sungai Guntung, FT003/619/50, Setiu, Terengganu.


(Menggantikan Jambatan Sungai Guntung, FT003/619/50, Setiu, Terengganu)

GPS Location: 5.58656 N; 102.70621 E

Structure Type: Single Span 65m by 14m Wide Composite Bridge System.

Superstructure Feature: 3 pieces of DURA® UBG2500-65m with Cast In-Situ RC Deck

Substructure Feature: Cast in-situ RC abutments 

Foundation Feature: 300mm dia. Micro Pile.

Loading Type: SV100 loadings (BS EN 1991-2-2003)

Client: Jabatan Kerja Raya Malaysia JKR                S.O.: JKR Daerah Setiu JKR

Consultant: Primareka Consultants  prima reka

Contractor: Dura Construction Sdn Bhd  4 DURA Construction 2

Contract Period: 24 months

Construction Status: Under Construction

Project Signboard.
Existing Sg. Guntung bridge built in 1961.
Existing Sg. Guntung bridge built in 1961.
Sg Guntung Bridge at FT003-619-50.
Project Signboard.
1/4 
start stop bwd fwd

Replacement of 57 Years Old Bridge at Sungai Kundang, Maran


Project: No more piers at Sungai Kundang, FT002/268/70, Maran, Pahang.


(Menggantikan Jambatan Sungai Kundang, FT002/268/70, Maran, Pahang)

GPS Location: 3.55657 N; 102.6692 E

Structure Type: Single Span 45m by 14m Wide Composite Bridge System.

Superstructure Feature: 4 pieces of DURA® UBG1750-45m with Cast In-Situ RC Deck

Substructure Feature: Cast in-situ RC abutments

Foundation Feature: 600mm dia. Spun Pile (Class B)

Loading Type: SV100 loadings (BS EN 1991-2-2003)

Client: Jabatan Kerja Raya Malaysia  JKR             S.O.: JKR Daerah Maran  JKR

Consultant: Primareka Consultants  prima reka             Contractor: Dura Construction Sdn Bhd      4 DURA Construction 2

Contract Period: 24 months

Construction Status: Under Construction

Project Signboard.
Existing Sg Kundang Bridge built in 1955.
Soffit view of existing bridge.
Project Signboard.
1/3 
start stop bwd fwd

Replacement of 57 Years Old Bridge Project at Sungai Raia, Kinta


Project: To Construct Bridge at Sungai Raia, FT001/583/20, Kinta, Perak.

 
(Menggantikan Jambatan Sungai Raia, FT001/583/20, Kinta, Perak)

GPS Location: 4.51582 N; 101.13747 E

Structure Type: Single Span 50m by 11m Wide Composite Bridge System.

Superstructure Feature: 3 pieces of DURA® UBG1750-50m with Cast In-Situ RC Deck

Substructure Feature: Cast in-situ RC abutments

Foundation Feature: 300mm dia. Micro Pile.

Loading Type: SV100 loadings (BS EN 1991-2-2003)

Client: Jabatan Kerja Raya Malaysia   JKR                 S.O.: JKR Daerah Kinta JKR

Consultant: Primareka Consultants  prima reka                  Contractor: Dura Construction Sdn Bhd  4 DURA Construction 2

Contract Period
: 24 months

Construction Status
: Under Construction

Project signboard for Sg. Raia Bridge
Existing Sg Raia Bridge.
Existing old bridge.
Micropiles used as foundation.
Maintain load testing in progress.
Construction of micropiles at abutment B completed (011018).
Lifing of DURA IB650-24m for the utility beams (141018).
Two numbers of DURA-IB650 was positioned.
Installation of precast DURA thin plank.
Two beams and precast DURA planks fully installed in half day.
Hacking of the existing old bridge (221018).
Hacking work in progress (221018).
Project signboard for Sg. Raia Bridge
01/12 
start stop bwd fwd