Replacement of 57 Years Old Bridge Project at Sungai Raia, Kinta


Project: To Construct Bridge at Sungai Raia, FT001/583/20, Kinta, Perak.

 
(Menggantikan Jambatan Sungai Raia, FT001/583/20, Kinta, Perak)

GPS Location: 4.51582 N; 101.13747 E

Structure Type: Single Span 50m by 11m Wide Composite Bridge System.

Superstructure Feature: 3 pieces of DURA® UBG1750-50m with Cast In-Situ RC Deck

Substructure Feature: Cast in-situ RC abutments

Foundation Feature: 300mm dia. Micro Pile.

Loading Type: SV100 loadings (BS EN 1991-2-2003)

Client: Jabatan Kerja Raya Malaysia   JKR                 S.O.: JKR Daerah Kinta JKR

Consultant: Primareka Consultants  prima reka                  Contractor: Dura Construction Sdn Bhd  4 DURA Construction 2

Contract Period
: 24 months

Construction Status
: Under Construction

Project signboard for Sg. Raia Bridge
Existing Sg Raia Bridge.
Existing old bridge.
Micropiles used as foundation.
Maintain load testing in progress.
Construction of micropiles at abutment B completed (011018).
Lifing of DURA IB650-24m for the utility beams (141018).
Two numbers of DURA-IB650 was positioned.
Installation of precast DURA thin plank.
Two beams and precast DURA planks fully installed in half day.
Hacking of the existing old bridge (221018).
Hacking work in progress (221018).
Project signboard for Sg. Raia Bridge
01/12 
start stop bwd fwd

Replacement of 57 Years Old Bridge Project at Sungai Jempul


Project: Construction of A Single Span DURA Bridge Crossing Sungai Jempul at Maran, Pahang.


(Menggantikan Jambatan Sungai Jempul, FT002/270/60, Maran, Pahang)
 
GPS Location: 3.55533 N; 102.68418 E

Structure Type: Single Span 45m by 14m Wide Composite Bridge System.

Superstructure Feature: 4 pieces of DURA® UBG1750-45m with Cast In-Situ RC Deck

Substructure Feature: Cast in-situ RC abutments

Foundation Feature: 600mm dia. Spun Pile (Class B)

Loading Type: SV100 loadings (BS EN 1991-2-2003)

Client: Jabatan Kerja Raya Malaysia  JKR

S.O.: JKR Daerah Maran JKR

Consultant: Primareka Consultants  prima reka

Contractor: Dura Construction Sdn Bhd   4 DURA Construction 2

Contract Period: 24 months

Construction Status: Under Construction
Project Signboard.
Exisitng Sg Jempol bridge.
Existing utilities at Sg Jempol bridge built in 1954.
Soffit view of external spans.
Soffit view of middle spans.
Assembly of UBG1750-45m at an open space near the bridge site.
Four UBG1750-50m ready for PT works.
Driving of 600mm dia. spun piles (081118).
Project Signboard.
1/8 
start stop bwd fwd


Single Span UHPC Bridge used at Sungai Chenerai from Tol Chenor to Bandar Tun Abdul Razak


Project: To Construct Bridge at Sungai Chenerai from Tol Chenor to Bandar Tun Abdul Razak Jengka, Maran, Pahang.


(Menaiktaraf Jalan Persekutuan FT 83 Dari Tol Chenor Ke Bandar Tun Abdul Razak Jengka, Maran, Pahang)

GPS Location: 3.7355540 N; 102.5382080 E

Structure Type: Single Spans 50m by 14m Wide (Left & Right) Composite Bridge System.

Superstructure Feature: 3 pieces of DURA® UBG2000-50m with Cast In-Situ RC Deck

Substructure Feature: Cast in-situ RC abutments

Foundation Feature: 300mm dia. Micropiles (Class B)

Loading Type: HA+ 45 units HB loadings (BD37/01)

Client: JKR Malaysia   JKR                                  S.O.: JKR Malaysia     JKR

Consultant: DPI Konsult Sdn Bhd

Contractor: Iswarabena Sdn Bhd    iswarabena logo

Contract Period: 12 months

Construction Status: Under Construction
Existing Sg Chenerai Bridge from Tol Chenor to Bandar Tun Abdul Razak.
Existing Sg Chenerai Bridge from Tol Chenor to Bandar Tun Abdul Razak.
Completion of micropilings (271018).
Existing Sg Chenerai Bridge from Tol Chenor to Bandar Tun Abdul Razak.