– U bridge girders are prefabricated using the revolutionary composite material
of ultra-high performance concrete and high-carbon-high-tensile steel fibers
(UHPdC). It is an excellent solution for bridge engineers looking for a cost
effective, fast construction, light-weight and high-durability option for bridge
span range of 16 to 60 m.
Figure
1 gives an example of a single span bridge with a total bridge span of 40 m and
total width of 15 m. The proposed bridge consists of two 2.5 m wide walkways
(parapet inclusive). The intermediate portion of the bridge consists of 3
notional lanes carriageway and is 10 m wide. If using Dura method, only THREE pieces of DURA® U1750BG are needed to
composite with a 200 mm thick cast in-situ R.C. slab. The DURA® U1750BG are spaces 5 m
apart c/c. In contrast, if using conventional method, seven pieces of the super
tee girders are needed in order to has similar structural