Another 35m Single Span DURA bridge Crossing Sungai Pinji at Ipoh


Project: To Replace Bridge at Sungai Pinji FT 3150/2/4 Bridge Sungai Pinji, Kinta, Perak Darul Ridzuan.


(Projek Menggantikan Jambatan FT 3150/2/4 Jambatan Sungai Pinji, Daerah Kinta, Perak Darul Ridzuan)

GPS Location: 4.530863 N; 101.071710 E

Structure Type: Single Spans 35m by 17m Wide Composite Bridge System.

Superstructure Feature: 4 pieces of DURA® UBG1250-35m with Cast In-Situ G40 RC Deck

Substructure Feature: Cast in-situ RC abutments

Foundation Feature: 300mm dia. Micropiles

Loading Type: HA+ 45 units HB loadings (BD37/01)

Client: Kementerian Kerja Raya Malaysia    KKr

S.O.: Jabatan Kerya Raya Kinta JKR

Consultant: Perunding HJRS

Contractor: ZA (Malaysia) Sdn Bhd

Contract Period: 18 months

Construction Status: Completed

Project signboard.
Construction site with temporary bailey bridge installed.
Construction site with temporary bailey bridge installed.
Construction site with temporary bailey bridge installed (031118).
New bridge site at Sungai Pinji.
Construction of micropiles at abutment A in progress (250119).
Driling of 300mm dia. hole.
Abutments completed (230619).
Four UBG1250-35m ready for beam launching.
Lifting of beam on to prime mover (290619).
Transporting beam for beam launching.
Lifting the last beam for positioning.
All four beam positioned as per drawing.
All four beam seated (290619).
Completed Kg Pinji bridge open for traffic.
Completed Kg Pinji bridge open for traffic.
Completed Kg Pinji bridge open for traffic.