2018 Projects

DURA Joint-Fill used in Canada MOT Project

Project Title: White Lake Narrows bridge, Highway 17, Ontario, Canada 

GPS Location: 48.721526N, -85.62603W

Structure Type:  In-filled UHPC material for precast concrete deck

Client: Ontario Ministry of Transportation

S.O.: TBT Engineers

Consultant: Stantec Consulting

Contractor/designer: Facca Incorporated

Contract Period: 12 months

Construction Status: Stage 1 and 2 Completed Summer 2018

Existing White Lake Bridge.
Pan mixer used at the site to batch DURA-UHPFRC.
Transporting DURA-UHPFRC for joint stitching.
Filling pockets of precast bridge deck panel with DURA.
Cover UHPC in-filled with piece formwork.
Removal of timber formwork afetr 1 day.
Existing White Lake Bridge.
1/6 
start stop bwd fwd

Dura Roof Panel Used at Lakeshore, Canada


Project Title: Dura Roof Panel used at Lakeshore


 GPS Location: 42.29861111N; 82.71055556W

Structure Type:  Shade Structure

Superstructure Feature: Asymmetrical Open Truss Design

Substructure Feature: Columns supported on internally tied framing for jetty.

Foundation Feature: Columns supported on internally tied framing for jetty.

Loading Type: Design for self-weight, wind load and wind reversal and snow loading.

Client: The Town of Lakeshore

S.O.: Dan Krutsch
Consultant: Landmark Engineers landmark engineer

Contractor/designer: Facca Incorporated facca

Contract Period: 12 months

Construction Status: Completed Summer 2018

Installation of Dura roof.
Installtion of Dura roof.
Dura roof panel used at resting station.
Dura roof panel used at resting station.
Dura roof panel used at resting station.
Dura roof panel used at resting station.
Dura roof panel used at resting station.
Installation of Dura roof.