ZhungLu-DURA Constructed an Elavation Highway from Zhongshan to Kaiping in China

Project Title:  Construction of Elevation Highway Bridge #3 from ZhongShan to Kaiping (中山至开平高速公路火炬3#)

GPS Location:  22.549556°N, 113.537362°E

Structure Type:  Multiple spans UHPC Composite Bridge System

Superstructure Feature: ZL-DURA UBG1600 c/w 180mm thk. bridge deck, 42pcs UBG1600-30m and 6 pcs UBG1600-35m

Substructure Feature:  RCC Piers

Foundation Feature:  T.B.A

Loading Type:  First Class Load of Highway (JTG D60-2015) 公路Ⅰ级荷载-公路桥涵设计通用规范

Client: Powerchina Roadbridge Group Co. Ltd  (中电建路桥集团)

Consultant: JSTI (Jiangsu Provincial Institute of Transportation Science) 苏交科

Contractor: ZhongLu-Dura International Engineering Limited by Share Ltd.(中路杜拉国际工程股份有限公司)

Construction Status: Completed

Mould and sheaths preparation.
Tightening of mould prior to casting.
Casting of UHPC into mould.
Carrying beam sgement for curing.
Spraying a layer of coating.
6
7
8
9
10
Installation of bearing for post-tensioning works.
Stressing of tendons.
13
14
ZL-Dura beam positioned.
Mould and sheaths preparation.