2010 Projects
Kg. Linsum Bridge - Malaysia’s First 50m Single Span UHPdC Composite Motorway Bridge, Negeri Sembilan.
Project: Cadangan Kerja-Kerja Menggantikan Sebuah Jambatan Konkrit (MTB) Serta Kerja-Kerja Berkaitan Di Kampung Linsum, Mukim Rantau, Daerah Seremban, Negeri Sembilan.
Structure Type: 50m x 4m composite bridge crossing Sg. Linggi
Superstructure Feature: 1 piece of DURA UBG1750-50m topped with 200mm thk in-situ RC deck
Substructure Feature: 600mm diameter spun pile
Loading Type: Full HA+30HB loading (BD37/01)
Client: JKR Negeri Sembilan
Contractor: Rolla Enterprise
Contract Period: 9 months
Construction Period: 5 months
Construction Status: Completed
Ultra Light Weight & Durable DURA L-Shape Retaining Wall For A Busy Road Like Jalan Kota Bahru, Gopeng, Perak.
Project: To supply, Delivery, Install of 76m long x 2.5m Tall Retaining Wall at Jalan Kota Bahru, Gopeng, Daerah Kinta, Perak D.R.
Structure Type: 2.5m tall x 72m long L-shaped retaining wall
Superstructure Feature: 36 pieces of DURA® SRWS2520
Substructure Feature: 600mm think well compacted crusher-run
Loading Type: Soil backfilled + 20kPa surcharge load
Client: JKR Kinta
Contractor: Dura Technology Sdn Bhd
Contract Period: 1 month
Construction Status: Completed
92m Long Monsoon Drain For A Local Housing Developer
Project: To supply, Delivery, Install and Construct Monsoon Drain & Retaining Wall for the Proposed Housing Scheme of 8 Units of Semi-Detached Houses on Lot 29041, Pasir Puteh, Mukim Hulu Kinta, Daerah Kinta, Perak D.R.
Structure Type:
- 1.5m tall x 1.0m base width x 3m long L-shaped UHPdC retaining wall composite with in-situ RC base for monsoon drain;
- 2.5m tall x 2.0m base width x 2.0m long L-shaped UHPdC retaining wall.
Superstructure Feature: 62 pieces of DURA® SRWS1510 and 11 pieces of DURA® SRWS2520
Substructure Feature: 600mm think well compacted crusher-run
Loading Type: Soil backfilled + 20kPa surcharge load
Client: Indra Pusaka Sdn Bhd
Contractor: Dura Technology Sdn Bhd
Contract Period: 1 month
Construction Period: 2 weeks
Construction Status: Completed