DURA Service Bridge Used in Malaysia First Animation Theme Park

Project: To Construct a Service Bridge at Animation Theme Park, Ipoh.

(Projek Cadangan membina 1 unit Bangunan Pintu Masuk satu (1) tingkat, 1 unit TNB substation 11/0.4kV, 6 unit ‘Drop off’’ Berbumbung, unit Pintu Gerbang, 634 unit Tempat Kereta, 92 unit Tempat Letak Motosikal, 16 unit Tempat Letak Bas di atas Plot E, di Zon 6 Bandar Meru Raya, Mukim untuk: Tetuan Animation Theme Park Sdn. Bhd. (Service Bridge))

GPS Location: 4.660873N; 101.08404E

Structure Type: 16m long single span service bridge, come with UHPC Composite Bridge System

Superstructure Feature: 7 pieces of DURA® IB650-16m

Substructure Feature: In-situ RC pile cap and 300mm dia. spun pile (Class B)

Client: Animation Theme Park Sdn. Bhd.  animation. theme park

S.O.: The Sanderson Design Group (Malaysia) Sdn. Bhd.  5283dcf00b5e5-sanderson-logo

Consultant: Jurutera Perunding Concrete Technology (Alternative Design)

Contractor: Maltecon Builder Sdn. Bhd.

Contract Period: 12 months

Construction Status: Completed

Pile cap completed (17/12/2014).
7 pieces of DURA® IB650-16m delievering to site (2/1/2015).
7 pieces of DURA® IB650-16m arrived at site (2/1/2015).
Launching DURA® IB650-16m onto abutment (2/1/2015).
Launching DURA® IB650-16m onto abutment (2/1/2015).
7 pieces of DURA® IB650-16m launched (2/1/2015).
7 pieces of DURA® IB650-16m launched (2/1/2015).
Formwork for end diaphragm is buillt.
End Diaphragm and deck has been casted and temporary formwork is built for G.I. galvanized steel railing.
Completed service bridge (01/07/2015).
Completed service bridge (01/07/2015).
Completed service bridge (01/07/2015).
Completed service bridge (01/07/2015).
Completed after 2 years.
Completed after 2 years.
Completed after 2 years.
Pile cap completed (17/12/2014).
01/16 
start stop bwd fwd

DURA Pedestrian Bridge Used in Malaysia First Animation Theme Park

Project: To Comstruct a Pedestrian Bridge at the Animination Theme Park at Ipoh.
 
(Membina 1 Unit Bangunan Pintu Masuk Satu (1) Tingkat, 1 Unit TNB Substation 11/0.4kV, 6 Unit ‘Drop off’’ Berbumbung,  unit Pintu Gerbang, 634 unit Tempat Kereta, 92 unit Tempat Letak Motosikal, 16 unit Tempat Letak Bas di atas Plot E, di Zon 6 Bandar Meru Raya, Mukim untuk: Tetuan Animation Theme Park Sdn. Bhd. (Pedestrian Bridge))        

GPS Location: 4.663077N; 101.08444E

Structure Type: 120m long multiple span pedestrian bridge, come with UHPC Composite Bridge System

Superstructure Feature: 24 pieces of DURA® IB650-19.5m

Substructure Feature: In-situ RC pile cap and 500mm dia. spun pile (Class C)

Client: Animation Theme Park Sdn. Bhd.   animation. theme park
S.O.: The Sanderson Design Group (Malaysia) Sdn. Bhd.  5283dcf00b5e5-sanderson-logo

Consultant: Jurutera Perunding Concrete Technology (Alternative Design)

Contractor: Maltecon Builder Sdn. Bhd.

Contract Period: 12 months

Construction Status: Completed        

Project detail of animation theme park at Ipoh.
Illustration of completed animation theme park studio.
Piling work in progress for the pedestrian bridge (05/12/2014).
Piling work in progress for the pedestrian bridge (05/12/2014).
Pouring concrete in temporary formwork for abutment (29/12/2014).
Abutment completed. (30/12/2014).
Abutment completed. (30/12/2014).
8 nos of Dura IB-650 launched (19/01/2015).
The completed bridge (01/07/2015)
The completed bridge (01/07/2015)
The completed bridge (01/07/2015)
The completed bridge (01/07/2015)
Soffit view of the pedestrian bridge (01/07/2015).
Ipoh Animation Themepark main bridge crossing the central lake.
Ipoh Animation Themepark main bridge crossing the central lake.
Ipoh Animation Themepark main bridge crossing the central lake.
Completed after 2 years.
Completed after 2 years.
Completed after 2 years.
Completed after 2 years.
Completed after 2 years.
Project detail of animation theme park at Ipoh.
01/21 
start stop bwd fwd

DURA Viaduct to Free the Elephants From Accidents

 42

Project: To Construct a Viaduct and Other Related Works at Section 49, Freeway 4 (KM157 Gerik-Kota Bahru), Corridor Ecology of Central Forest Spine (CFS), Gerik, Perak D.R. 
(Membina dan Menyiapkan 'Viaduct' dan Lain-Lain Kerja Yang Berkaitan Di Seksyen 49, Laluan 4 (KM 157 Gerik-Kota Bahru), Koridor Ekologi Central Forest Spine (CFS), Gerik, Perak Darul Ridzuan.)

Structure Type: Five span 40m x 17.4m wide UHPC composite bridge, total length of 200m.

GPS Coordinate: 5.586919N, 101.477091 E

Superstructure Feature: 15 pieces of DURA® UBG2000-39.5m

Substructure Feature: 300mm diameter micropiles

Client: Jabatan Perhutanan Semenanjung Malaysia   Jabatan Perhutanan Semenanjung Malaysia       S.O.: JPS and JPS Perak    jps

Consultant: Perunding HJRS Sdn Bhd    hjrs        Contractor: Empayar Kukuh Sdn Bhd

Contract Period: 18 months

Construction Status: Completed 

Project sign board.
Micropile machine ready to start work (22/12/2013).
Micropiling work in progress (03/03/2014).
Micropile done at abutment A.
Drilled of holes at pier 1.
The site.
Unloading DURA U beam (29/04/2014).
Two numbers of DURA UBG2000-39.5m assembled at site (29/04/2014).
Construction of piers in progress (19/09/2014).
Pier 3 partially completed (19/09/2014).
Construction of pier 2 in progress (19/09/2014).
PC strands were installed in DURA beams.
Substructures all ready for beam launching (02/11/2014).
Beam launching (07/11/2014).
Beam launching (07/11/2014).
Three spans launched (07/11/2014).
Three spans launched (07/11/2014).
All Dura beams launched (12/11/2014).
All Dura beams launched (12/11/2014).
Steel reinforcement for in situ decking on slab 4.
Epoxying the segmental joint and painting it.
In preparation to cast the final two spans.
Bottom view of Central Forest Spine (CFS) bridge.
Bottom view of Central Forest Spine (CFS) bridge.
Scaffolding and timber formwork used as formwork for RC decking (CFS) bridge.
Launching precast parapet.
Launching precast parapet.
Launching precast parapet.
Completion of five span DURA composite bridge, 200m long x 17.6m wide.
Beam soffit view.
Side view of the new bridge.
Approach road of CFS bridge.
Pavement view of CFS bridge.
CFS bridge open to traffic.
Completed CFS bridge.
Completed CFS bridge.
Completed CFS bridge.
Completed CFS bridge.
Completed CFS bridge.
Open ceremony day for CFS bridge (22/09/2015).
Soffit view of the CFS bridge (22/09/2015)
After 2 years.
After 2 years.
Project sign board.
01/43 
start stop bwd fwd

50m Single Span Crossing Sungai Ijok, Perak

Project: Memperelokkan Jalan Taiping/selama, Daerah Larut, Matang Dan Selama, Perak Darul Ridzuan. (fasa 2a :  Kubu Gajah Ke Penempatan Rancangan Belia Pondok Tanjung) Bridge 2- Sg Ijok       

GPS Location: 5.081517 N; 100.720305 E

Structure Type: Single span 50m long x 14m wide UHPC Composite Bridge System

Superstructure Feature: 3 pieces of DURA® UBG2000-49.5m

Substructure Feature: 500mm dia. spun pile (Class B)

Client: JKR Perak      JKR

S.O.: JKR Daerah Larut, Matang & Selama

Consultant: Jurutera Perunding Concrete Technology

Contractor: Solid Gold Synergy Sdn Bhd

Contract Period: 18 months

Construction Status: Completed      

Existing old bridge crossing Sg. Ijok.
Sg. Ijok.
Piling done at Abutment B (11/09/2014).
Construction of pile cap at abutment A (11/09/2014).
Unloading DURA UBG-50m segments (04/12/2014).
A single span DURA UBG-50m fully assembled off-site (04/12/2014).
Sg. Ijok bridge beam launching day (01/07/2015).
Lifting of 1st beam onto a truck.
Transporting first beam to the bridge site.
Launching the first beam to the abutment seatings.
First beam launched.
Lifting of 2nd beam.
Three DURA UBG2000-49.5m launched.
Three DURA UBG2000-49.5m launched.
Abutment A casted.
Preparation of timber formwork for deck casting.
Preparation of timber formwork for deck casting.
Preparation of timber formwork for deck casting.
Fixing reinforcement and formwork for Abutment B.
Steel reinforcment for the RC deck.
Completion of RC deck and RC parapet.
Laying of binder course at approach road.
Completion of Sg Ijok bridge.
Completed after 3 years.
Completed after 3 years.
Completed after 3 years.
Completed after 3 years.
Completed after 3 years.
Existing old bridge crossing Sg. Ijok.
01/28 
start stop bwd fwd
"" ""

40m span DURA Composite Bridge Used at Kok Lanas, Kelantan


Project
: Menaiktaraf Jalan Dari Kok Lanas Ke Sek. Banggol Saman Ke Sek. Danang, Kereteh, Pasir Putih, Kelantan. Fasa 2. (Bridge 2)

GPS Location: 5.921996N, 102.307015 E

Structure Type: Single span 40m long x 12m wide DURA composite bridge.

Superstructure Feature: 2 pieces of DURA UBG1750-40m

Substructure Feature: Cast in-situ RC abutments

Foundation Feature: 500mm dia. PC Spun Pile (Grade80, Class B)

Loading Type: Full HA + KEL & 45 units HB loadings

Client: KKLW    Logo KKLW

Consultant: M Zah Perunding

Contractor: Jemmings Sdn Bhd

Contract Period: 24 months

Status: Completed         

Proposed single span 40m road bridge.
Transporting UBG1750-40m for beam launching (08/04/2015).
Transporting UBG1750-40m for beam launching (08/04/2015).
Lifting of the Precast Dura U beam (08/04/2015).
Lifting of the Precast Dura U beam (08/04/2015).
DURA U beam seated on the plinth (08/04/2015).
Timber formwork used for the in-situ concrete decking.
Complete single span 40m long Kok Lanas Bridge.
Complete single span 40m long Kok Lanas Bridge.
Proposed single span 40m road bridge.
1/9 
start stop bwd fwd



© 2009-2021 by GPIUTMD