2021 Projects
New Bridge 20m Single Spans in Kampung Air Simpol
Project: To Build A New Bridge At Kampung Air Simpol, Sungai Jernih, Mukim Hulu Ijok
(Bina Baru Jambatan Serta Kerja Berkaitan Di Kampung Air Simpol, Sungai Jernih, Mukim Hulu Ijok, Perak)
GPS Location: 5.135107 N; 100.874092 E
Structure Type: Single Spans 20m by 3.5m Wide UHPFRC integral beam-deck system.
Superstructure Feature: 2 pieces of DURA® IB850-20m
Substructure Feature: Cast in-situ RC abutments
Foundation Feature: 200mm x 200mm dia. SQ RC pile (Class B)
Loading Type: HA+ 30 units HB loadings (BD37/01)
Client: Jabatan Tanah Selama
S.O.: Jabatan Tanah Selama
Consultant: JPCT
Contractor: Prisma Canggih Ent
Contract Period: 6 Weeks
35m Single Span DURA Bridge in Kampung Belum Baru
Project: Project Connection of Village with Kampung Belum Baru Bridge Lenggong, Perak)
(Projek Jalan Perhubungan Desa – Jambatan Kampung Belum Baru Lenggong, Perak)
GPS Location: 5.269776 N; 101.063947 E
Structure Type: Single Span 35m by 7m Wide UHPFRC Composite Road Bridge System
Superstructure Feature: 2 pieces of DURA® UBG1250-35m with Cast In-Situ RC Deck
Substructure Feature: RC Abutments
Foundation Feature: 300mm Dia. Micro Piles
Loading Type: HA + KEL or 30 Units HB Loadings (BD37/01)
Client: JPS Perak
S.O.: JPS Perak
Consultant:
Contractor: PERNIAGAAN EMZEK
Contract Period: 20 Months
Pedestrian Bridge in Melaka using Dura UBG1500
Project: To Construct a Pedestrian Bridge at Laluan FT019 – Lebuh AMJ (SK Agama Balai Panjan), Melaka
(Membina Jejantas Pejalan Kaki Di Laluan FT019 – Lebuh AMJ (SK Agama Balai Panjang), Melaka)
GPS Location: 2.223799 N; 102.232931 E
Structure Type: Single Span 39.75m by 2.5m Wide UHPFRC Composite Pedestrian Bridge System
Superstructure Feature: 1 pieces of DURA® UBG1500-39.75m with Cast In-Situ RC Deck
Substructure Feature: RC Columns
Foundation Feature: 350mm Dia. Micropiles (Class B)
Loading Type: 5 kPa (BD37/01)
Client: JKR Malaysia
S.O.: JKR Melaka Tengah
Consultant:
Contractor: Reximius Sdn Bhd
Contract Period: 20 Months
Construction Status: Completed
New Concrete Bridge 24.5m at Klebang Mutiara, Perak
Project: To Build A New Concrete Bridge Along Jalan Klebang Selatan For Development At Klebang Mutiara, Mukim Hulu Kinta, Perak
(Pelan Jalan Dan Perparitan Bagi Cadangan Skim Perumahan Di Atas PT 263955 (HSD226804) Lot Baru 529352, PT 263956 (HSD226805) Lot Baru 529353, Lot 397870 – Lot 397873, Lot 397874 – Lot 397910, Lot 397911 – Lot 397930 Dan Lot 397931 – Lot 397935, Berhampiran Taman Klebang Mutiara, Mukim Hulu Kinta Daerah Kinta, Perak Darul Ridzuan Untuk Tetuan Regat Pusaka Sdn Bhd Dan Nusajaya Kapital Sdn Bhd.)
GPS Location: 4.669774 N; 101.103865 E
Structure Type: Single Spans 24.5m by 10.4m Wide UHPFRC integral beam-deck system.
Superstructure Feature: 7 pieces of DURA® IB850-24.5m
Substructure Feature: Cast in-situ RC abutments
Foundation Feature: Mass Fiber Concrete
Loading Type: HA+ 30 units HB loadings (BD37/01)
Client: Regat Properties Sdn Bhd
Consultant: Jurutera Perunding Concrete Technology
Contractor: Maltecon Builders Sdn Bhd
Contract Period: 5 Months
Construction Status: Completed
LBC Kayan Main Drain for Flood Preventation Project by Dura UHPFRC
Project: Upgrading and Flood Prevention Works At LBC Kayan Main Drain, IADA Seberang Perak, Perak Darul Ridzuan
(Kerja-Kerja Menaiktaraf Dan Pencegah Banjir Di LBC Dan Kayan Main Drain, IADA Seberang Perak, Perak Darul Ridzuan)
GPS Location: 4.050330 N; 100.829866 E
Structure Type: Single Spans 34m by 4.5m Wide UHPFRC integral beam-deck system.
Superstructure Feature: 1 pieces of DURA® UBG1250-34m
Substructure Feature: Cast in-situ RC abutments
Foundation Feature: 300mm x 300mm dia. SQ RC pile (Class B)
Loading Type: HA+ 30 units HB loadings (BD37/01)
Client: JPS Malaysia
S.O.: JPS Perak Tengah
Consultant: Jurutera Perunding Kintareka
Contractor: Excel Ray Engineering Sdn Bhd
Contract Period: 15 Months
Construction Status: Completed
More Articles...
- 25m Single Spans New Bridge in Hulu Perak
- Upgrading Agricultural Drainage System using Single Spans Dura UHPFRC
- Project for Upgrading Agricultural Drainage System 20m Single Spans Using DURA Bridge in Kelantan
- Jebong Bridge 2 in Perak using Single Span of Dura UHPFRC
- Jebong Bridge in Perak using Single Span of Dura UHPFRC
- 63m New Bridge Build in Kg. Sepah , Johor
- DURA 70m Girder Used at Duke , Section 2 Interchange 3 Ramp 3A
- DURA Long Span U Girder Used in Duke 3 Section 2 from Pier 21 to Pier 50
- Dura U Beams Firstly Used in LLM Project- Duke 3 Section 2
- Replacing Jambatan Buloh using UHPFRC Accelerate Bridge Construction (ABC) Method