2022 Projects

The New Bridge for "Washed Away" Kampung Sawa Bridge During 2014/2015 Massive Flood.


Project: To Construct a New Bridge In Kampung Sawa, and Related Works, Hulu Perak District, Perak D.R. (Post Flood). (PERS/752/2015)


(Membina Jambatan Baru Di Kampung Sawa, Dan Kerja-Kerja Yang Berkaitan, Daerah Hulu Perak, Perak D.R. (Pasca Banjir). (PERS/752/2015)


GPS Location: 5.210554 N, 101.071142 E

Structure Type: Four Spans 45m+45m+55m+35m x 5m Wide Composite Bridge System.

Superstructure Feature: 2 pieces of DURA ® UBG2000-45m, 1 piece of DURA ® UBG2000-55m, 1 piece of DURA ® UBG2000-35m, with Cast In-Situ RC Deck

Substructure Feature: Cast in-situ RC abutments and RC piers

Foundation Feature: 300mm dia. micropiles

Loading Type: HA+KEL or 30 units HB loadings (BD37/01)

Client: KKLW    Logo KKLW                         S.O.: JKR Hulu Perak    JKR

Consultant: N/A

Contractor: Lumut Project Management Sdn Bhd

Contract Period: 24 months (from 18 Jan 2016 to 18 Jan 2018)

Construction Status: Completed
Existing bridge at Kampung Sawa was destroyed by the year 2015 Dec massive flood.
Existing bridge at Kampung Sawa was destroyed by the year 2015 Dec massive flood.
Existing bridge at Kampung Sawa was destroyed by the year 2015 Dec massive flood.
Existing bridge at Kampung Sawa was destroyed by the year 2015 Dec massive flood.
Project signboard and detail.
Demolisation of existing concrete bridge.
Demolisation of existing concrete bridge.
Construction of 300mm diameter micropiles.
Construction of 300mm diameter micropiles.
Marking of position of micropile for pier 3.
Partially constructed pier 2.
Partially constructed substructures.
Transportation of UBG2000 girder segments.
Two segments positioned.
Six segments for second span positioned.
Positioning of end segment for first span.
Two numbers of UBG2000-45m already post-tensioned.
Two numbers of UBG2000-45m already post-tensioned.
Setting up giant crane for direct beam launching for UBG2000-55m.
Setting up of crane for beam launching.
Setting of crane for beam launching.
Setting of crane for beam launching.
Lifting of UBG2000-55m (140t) using a single lifting method.
Lifting of UBG2000-55m (140t) using a single lifting method.
Positioning UBG2000-55m.
Picking up last beam (UBG200-35m).
Swinging beam to the pier positions.
Positioning the last beam across Perak river.
UBG2000-35m positioned on the abutment B.
Beam launching completed.
Completed Kg. Sawa Bridge.
Completed Kg. Sawa Bridge.
Completed Kg. Sawa Bridge.
Completed Kg. Sawa Bridge.
Existing bridge at Kampung Sawa was destroyed by the year 2015 Dec massive flood.