Project StatusAll ProjectsCompleted(242)On Going(57)Select CountryAll CountriesCanada(3)China(13)India(37)Malaysia(238)Others(8)Select Years All2025 (60)2024 (37)2023 (48)2022 (9)2021 (19)2020 (22)2019 (17)2018 (14)2017 (15)2016 (11)2015 (13)2014 (13)2013 (10)2012 (5)2011 (2)2010 (3)2008 (1) Reset To Construct New Bridge at Kampung Bahagia ,Teluk Intan, Perak using DURA® UBG2500 – 60m lengthYear: 2025Status: On GoingCountry: Malaysia To Construct a Bridge at Kg.Tinanduk, Nabawan,Sabah using DURA®IB1000 – 24m and DURA®IB1300 – 30m lengthYear: 2025Status: On GoingCountry: Malaysia To Replace Old Bridge at Jalan Tun Perak ( Near Medan Kidd ),Ipoh,Perak Using DURA®IB850 – 25m lengthYear: 2025Status: CompletedCountry: Malaysia To Replace Old Bridges at Sungai Chandon and Sungai Mengkuang,Bera,Pahang Using DURA®IB650 – 18m lengthYear: 2025Status: On GoingCountry: Malaysia To Construct 2 New Bridges at Jalan Pandan Indah and Jalan Pandan Mewah,Ampang, Selangor Using DURA® IB1000 – 29.5m and DURA® IB650 – 13.75m lengthYear: 2025Status: On GoingCountry: Malaysia To Replace Old Bridge at Kampung Padang Setol,Padang Terap,Kedah Using DURA®UBG1250 – 35m, DURA®IB850 – 15m and DURA®IB850 – 25m lengthYear: 2025Status: On GoingCountry: Malaysia To Construct Linkway Bridge for Kuala Kedah Jetty, Kedah using DURA®IB1200-21.1m lengthYear: 2025Status: On GoingCountry: Malaysia Installation of Roofing Beam for Commercial Building in Sitiawan, Perak Using DURA®IB850 – 21.24m lengthYear: 2025Status: CompletedCountry: Malaysia Flood Mitigation Project at Sungai Pemandi, Johor using DURA®IB850 – 24m lengthYear: 2025Status: CompletedCountry: Malaysia To Construct New Bridge at Sungai Chadak,Perak using DURA®IB850 – 15m length.Year: 2025Status: On GoingCountry: Malaysia Previous Page1 Page2 Page3 Page4 … Page30 Next