Construction of Nanoli Speedway – Formula 3 – Pit building, station and hospital, India

  • Reset
Project Title

Construction of Nanoli Speedway – Formula 3 – Pit building, station and hospital; A - Pit Building at Nanoli Speedway B - Medical Center at Nanoli Speedway C - Fuel Station at Nanoli Speedway

Project Year

2024

Status

On Going Project

Country

India

GPS Cordinates

18.785333 N, 73.584306 E

Structure Type

UHPFRC Building

Superstructure Feature

A. Pit Building - 128 pieces of ground floor UHPC column 300mm x 200mm by 5075mm height. - 95 pieces of first floor UHPC column 200mm x 200mm by 3252mm height. - 76 pieces of ground floor UHPC beam 200mm x 200mm by 3375mm long. - 16 pieces of cantilever UHPC beam 200mm x 300mm by 6750mm long. B. Medical Center - 12 pieces of UHPC column 200mm x 300mm. C. Fuel Station - 12 pieces of UHPC column 200mm x 300mm. - 10 pieces of UHPC beam 300mm x 300mm. - 32 pieces of UHPC rafter 75mm x 150mm. - 10 pieces of UHPC beam 300mm x 300mm. - 24 pieces of UHPC rafter 70mm x 150mm.

Client

Nanoli Speedways

Contractor

B. G. Shirke