Kerja-Kerja Membina Dan Pencegah Banjir Sungai Kurau Dari Pondok Tanjung Ke Hulu Sepanjang 4.88KM Serta Kerja Kerja Lain Yang Berkaitan, Dearah Larut Matang Dan Selama, Perak Darul Ridzuan (Bridge 2 - CH10080)
2014
Completed Project
Malaysia
5.025612 N , 100.697033 E
Single span 50m x 4.8m wide UHPC U-beam composite bridge
1 piece of DURA® UBG1750-50m topped with 180mm thk in-situ RC deck slab
450mm dia. Spun Pile (Class B)
Full HA+30 unit HB loadings
JKR Perak

Dura Technology Sdn Bhd
Harta Minda Sdn Bhd
Completed