Project StatusAll ProjectsCompleted(203)On Going(26)Select CountryAll CountriesCanada(3)China(12)India(22)Malaysia(185)Others(7)Select Years All2024 (28)2023 (47)2022 (9)2021 (19)2020 (22)2019 (17)2018 (14)2017 (15)2016 (11)2015 (13)2014 (13)2013 (10)2012 (5)2011 (2)2010 (3)2008 (1) Reset To Upgrade Bridge at Sungai Sembrong, Batu Pahat, Johor Using UBG1250-35mYear: 2024Status: On GoingCountry: Malaysia Mumbra Bridge OverlayYear: 2023Status: CompletedCountry: India 4-laning of existing 2-laning stretch from Dharmapuri at km. 117.000 το Lonand- at KM. 166.400 (Pkg-iv) on Mohol-Alandi section (design length 49.400 km) of NH-965 in the state of Maharashtra on EPC modeYear: 2024Status: On GoingCountry: India 4-Laning of existing 2-laning stretch from Dharmapuri at KM 117.000 to Lonand- at km. 166.400 (Pkg-iv) on Mohol-Alandi section (design length 49.400 km) of nh-965 in the state of Maharashtra on EPC modeYear: 2024Status: On GoingCountry: India 4-laning of existing 2-laning stretch from Dharmapuri at km. 117.000 to Lonand at km. 166.400 (Pkg-iv) on Mohol-Alandi section (design length 49.400 km) of nh-965 in the state of Maharashtra on EPC modeYear: 2024Status: CompletedCountry: India 4- Laning of existing 2- Laning stretch from Dharampuri at km. 117.00 to Lonand at km. 166.400 (Pkg-IV) on Mohol-Alandi section ( Design Length 49.400 km) of NH-995 in the State of Maharashtra on EPC Mode.Year: 2024Status: On GoingCountry: India 4- Laning of existing 2- Laning stretch from Dharampuri at km. 117.00 to Lonand at km. 166.400 (Pkg-IV) on Mohol-Alandi section ( Design Length 49.400 km) of NH-995 in the State of Maharashtra on EPC ModeYear: 2024Status: CompletedCountry: India To Replace Old Steel Sheet Pile with New Sheet Pile for Slope Protection at Petaling Jaya Lake, Selangor using DURA Prestressed Sheet Pile (PSP) 500AYear: 2024Status: On GoingCountry: Malaysia TURBHE ROB [Flyover] – Rehabitation of Turbhe ROB on Sion Panvel highway KM. 129/425 to KM. 130/145 Taluka – Thane, Dist – ThaneYear: 2024Status: On GoingCountry: India 4- Laning of existing 2- Laning stretch from Dharampuri at km. 117.00 to Lonand at km. 166.400 (Pkg-IV) on Mohol-Alandi section ( Design Length 49.400 km) of NH-995 in the State of Maharashtra on EPC Mode.Year: 2023Status: CompletedCountry: India Previous Page1 Page2 Page3 … Page23 Next