Project StatusAll ProjectsCompleted(230)On Going(55)Select CountryAll CountriesCanada(3)China(13)India(34)Malaysia(227)Others(8)Select Years All2025 (46)2024 (37)2023 (48)2022 (9)2021 (19)2020 (22)2019 (17)2018 (14)2017 (15)2016 (11)2015 (13)2014 (13)2013 (10)2012 (5)2011 (2)2010 (3)2008 (1) Reset To Construct New Bridge at Sungai Lebrasau, Sarawak using DURA®UBG1250 – 30m length.Year: 2025Status: On GoingCountry: Malaysia To Construct New Bridge at Sungai Peluan, Sarawak using DURA®UBG1250 – 30m length.Year: 2025Status: On GoingCountry: Malaysia To Replace Old Bridge at Kampung Kurnia Jaya, Taiping using DURA®IB650 – 18m length.Year: 2025Status: On GoingCountry: Malaysia To Replace Old Concrete Bridge at Pasir Bayam , Raub , Pahang using DURA®UBG2000 – 50m lengthYear: 2025Status: CompletedCountry: Malaysia To Replace Old Concrete Bridge at Ulu Paku, Betong, Sarawak using DURA®IB1000 – 21.5m length.Year: 2025Status: On GoingCountry: Malaysia To Upgrade Gita Lama Bridge at Kampung Gita Lama , Kuching , Sarawak using DURA®IB850 – 16.5m lengthYear: 2025Status: CompletedCountry: Malaysia To Build New Utilities UHPFRC Pipe Bridge at Baling , Kedah using DURA®IB1200 – 28m lengthYear: 2025Status: CompletedCountry: Malaysia TNT – RTO Flyover 1 (NRU002+820), Flyover 2 (NRU003+440)Year: 2025Status: CompletedCountry: India To Construct Road Bridge at Sepanggar, Kota Kinabalu , Sabah using DURA®IB1200 – 24m , DURA®IB1300 – 33m to 35mYear: 2025Status: On GoingCountry: Malaysia To Construct New Bridge at Sg.Liawan , Keningau , Sabah using DURA®UBG2000 – 55m length.Year: 2025Status: CompletedCountry: Malaysia Previous Page1 Page2 Page3 Page4 Page5 … Page29 Next