Project StatusAll ProjectsCompleted(221)On Going(61)Select CountryAll CountriesCanada(3)China(13)India(34)Malaysia(224)Others(8)Select Years All2025 (43)2024 (37)2023 (48)2022 (9)2021 (19)2020 (22)2019 (17)2018 (14)2017 (15)2016 (11)2015 (13)2014 (13)2013 (10)2012 (5)2011 (2)2010 (3)2008 (1) Reset To Replace Old Concrete Bridge at Pasir Bayam , Raub , Pahang using DURA®UBG2000 – 50m lengthYear: 2025Status: CompletedCountry: Malaysia To Replace Old Concrete Bridge at Ulu Paku, Betong, Sarawak using DURA®IB1000 – 21.5m length.Year: 2025Status: On GoingCountry: Malaysia To Upgrade Gita Lama Bridge at Kampung Gita Lama , Kuching , Sarawak using DURA®IB850 – 16.5m lengthYear: 2025Status: On GoingCountry: Malaysia To Build New Utilities UHPFRC Pipe Bridge at Baling , Kedah using DURA®IB1200 – 28m lengthYear: 2025Status: CompletedCountry: Malaysia TNT – RTO Flyover 1 (NRU002+820), Flyover 2 (NRU003+440)Year: 2025Status: CompletedCountry: India To Construct Road Bridge at Sepanggar, Kota Kinabalu , Sabah using DURA®IB1200 – 24m , DURA®IB1300 – 33m to 35mYear: 2025Status: On GoingCountry: Malaysia To Construct New Bridge at Sg.Liawan , Keningau , Sabah using DURA®UBG2000 – 55m length.Year: 2025Status: On GoingCountry: Malaysia To Construct UHPC Bridge at Khlong Khlung District , Kamphaeng Phet Province , Thailand using DURA®UBG2000-55m length.Year: 2025Status: On GoingCountry: Others To Construct UHPC Bridge at Sungai Kedup , Beruan , Serian , Sarawak using DURA®UBG1500-40m length.Year: 2025Status: On GoingCountry: Malaysia To Construct 135m UHPC Bridge at Pekan Kiulu-Kg Bayag , Tuaran , Sabah using DURA®IB650, DURA®IB850 & DURA®UBG1750Year: 2025Status: On GoingCountry: Malaysia Previous Page1 Page2 Page3 Page4 Page5 … Page29 Next